CM Mohan Yadav: Daytime farm power in Kisan Kalyan Varsh
Synopsis
Key Takeaways
Madhya Pradesh Chief Minister Dr. Mohan Yadav has staked a clear claim on the rural grid: power when the farmer is in the field, and power that does not die when the village goes home. On 27 November 2026, he said his government is working with determination, in Kisan Kalyan Varsh, to deliver daytime electricity to cultivators.
In his words, the government is determined to make daytime power available to farmers. Village supply of 24 hours and farm supply of 8 to 10 hours, he said, is making cultivators' lives more secure and convenient.
24-hour villages, 8 to 10 hours on the farm
Those two numbers are the heart of the pitch. Round-the-clock current in hamlets is meant to keep homes, shops and community life running after dark. A dedicated 8 to 10 hour window on agricultural feeders is meant to run pumps in daylight, cutting the risk of night irrigation and making the workday more predictable.
Dr. Yadav tied the effort to Kisan Kalyan Varsh (Farmer Welfare Year). He did not gazette a new law in the post. He restated a direction: daytime farm power as a welfare promise, not a technical footnote.
The feeder-separation model behind the hours
Madhya Pradesh has pursued rural feeder separation and village electrification since the mid-2010s, splitting household and farm loads so one does not starve the other. The design is familiar across several Indian states: 24-hour village feeders, scheduled agricultural feeders, lower losses, and fewer farmers walking canals after midnight.
Gujarat and other states rolled out similar splits earlier. Madhya Pradesh's version sits in that lineage — an agrarian state treating reliable irrigation power as both infrastructure and politics. Farmers and rural households are the named stakeholders. The grid, not the slogan, will decide if life in the fields is actually safer.
For Madhya Pradesh's cultivators, the measure of Kisan Kalyan Varsh will be a pump that starts while the sun is still high.