Mehbooba Mufti stopped on way to Sheshnag Lake amid row

Share:
Audio Loading voice…
Mehbooba Mufti stopped on way to Sheshnag Lake amid row

Synopsis

Mehbooba Mufti was stopped at Chandanwari as she tried to visit Sheshnag Lake, where excavation near the Amarnath pilgrimage route has prompted environmental concerns. The BRO says its track work is intended to improve pilgrim safety and follows environmental safeguards.

Key Takeaways

Mehbooba Mufti was stopped at Chandanwari on 24 November while heading towards Sheshnag Lake , according to the PDP .
Sheshnag is a halting destination during the Shri Amarnathji shrine Yatra .
Videos on social media have shown an earth-moving machine excavating soil by the lake.
The BRO says it is widening and stabilising the track for pilgrim safety while following environmental safeguards.
Mufti has criticised the reported work, while allegations of a motorable road from Pahalgam to the shrine have drawn condemnation.

Mehbooba Mufti was stopped on Tuesday, 24 November, while travelling to Sheshnag Lake in south Kashmir, her party said, amid controversy over excavation near the ecologically fragile water body. The former Jammu and Kashmir chief minister had sought to visit the area after videos showed an earth-moving machine digging by the lake.

The Border Roads Organisation (BRO) has defended its work, saying it is widening and stabilising the track to improve safety and movement for Amarnath pilgrims while following environmental safeguards.

Mufti stopped at Chandanwari

According to the Peoples Democratic Party (PDP), which Mufti leads, she was stopped at Chandanwari while proceeding towards Sheshnag. She was accompanied by Pulwama MLA Waheed-ur-Rehman Para, Budgam MLA Aga Muntazir and Shabir Mir.

The attempted visit came as the use of heavy machinery near the high-altitude lake drew concern about its possible effect on the Himalayan ecosystem. The account did not specify who stopped Mufti or what reason, if any, was given.

Excavation near the pilgrimage route

Videos circulating on social media have shown an earth-moving machine excavating soil by the banks of Sheshnag Lake, a halting destination during the Shri Amarnathji shrine Yatra. The lake is in the Pahalgam area of south Kashmir.

The reported excavation and track-widening work has raised questions about the potential impact on the surrounding environment. The dispute also concerns the nature of the work being carried out along a route used by pilgrims.

There are allegations that authorities are making a motorable road from Pahalgam to the holy cave shrine. The account does not establish whether such a road is being built; it reports that the allegations have drawn condemnation from environmentalists and religious, social and political leaders.

BRO defence and political criticism

The BRO says its work consists of track-widening and stabilisation measures intended to improve pilgrims' safety and movement. It maintains that environmental safeguards are being followed.

Mufti had earlier criticised the reported construction activity, accusing the elected government of remaining a spectator to environmental degradation. She also warned against the destruction of Kashmir's forests, mountains and water bodies in the name of infrastructure development.

Her criticism and the BRO's explanation address different aspects of the controversy: the potential environmental consequences of work near the lake and the stated need to improve the pilgrimage route. The account does not detail the safeguards the organisation says it is following.

Questions over the work ahead

The issue affects the area around Sheshnag Lake as well as the route used by Amarnath pilgrims. Concerns raised by environmentalists and other leaders have focused attention on what the excavation and widening involve.

The account provides no schedule for further work or a fresh visit by Mufti. Attention remains on the scope of the track work and the environmental safeguards the BRO says are in place.

Point of View

Particularly when allegations about a motorable road remain unresolved. Authorities should also explain why an elected leader was stopped, if a restriction was imposed.
NationPress
24 Nov 2026

Frequently Asked Questions

Why was Mehbooba Mufti stopped on her way to Sheshnag Lake?
The reason for stopping Mehbooba Mufti was not specified in the account. Her party said she was stopped at Chandanwari while travelling towards Sheshnag amid the excavation controversy.
What is the Sheshnag Lake excavation controversy?
The controversy concerns excavation and track-widening work near the ecologically fragile lake on the Amarnath pilgrimage route. Videos have shown an earth-moving machine digging by its banks, prompting environmental concerns.
What has the BRO said about the work near Sheshnag?
The BRO says it is widening and stabilising the track to improve the safety and movement of Amarnath pilgrims. It maintains that environmental safeguards are being followed.
Is a motorable road being built from Pahalgam to the Amarnath shrine?
There are allegations that authorities are making a motorable road from Pahalgam to the holy cave shrine, but the account does not establish whether one is being built. The BRO describes its work as track widening and stabilisation.
What happens next in the Sheshnag excavation row?
No schedule for further work or another visit by Mufti was given in the account. The scope of the work and the safeguards cited by the BRO remain central to the controversy.
Nation Press
The Trail

Connected Dots

Tracing the thread behind this story — newest first.

8 Dots
  1. Latest 3 weeks ago
  2. 3 months ago
  3. 4 months ago
  4. 4 months ago
  5. 4 months ago
  6. 1 year ago
  7. 1 year ago
  8. 1 year ago
Google Prefer NP
On Google