Shekhawat: Cabinet clears Rs 2,014-cr Dolu airport in Assam
Synopsis
Key Takeaways
Assam's Barak Valley is about to get a new aviation gateway. Union Culture and Tourism Minister Gajendra Singh Shekhawat said on 25 November 2026 that the Union Cabinet has approved a Rs 2,014 crore greenfield airport at Dolu near Silchar, with a modern terminal designed to handle 800 passengers an hour.
In a post on X tagged #CabinetDecisions, Shekhawat said the Cabinet had cleared construction of the new airport at Dolu in Silchar, Assam, at a cost of Rs 2,014 crore. A terminal with modern facilities will be built, he wrote, with the capacity to handle 800 passengers in one hour. The project, he added, will give new impetus to development in Assam and the Northeast, better air connectivity, and economic activity in the region.
Greenfield runway for Dolu, not an upgrade
This is a from-scratch airport, not a facelift of an existing strip. Greenfield means new land, a new runway and a new terminal. Shekhawat located that site at Dolu in the Silchar belt — the heart of Assam's Barak Valley, where hills, river country and thin scheduled air services have long stretched travel times to the rest of India.
He described a terminal with modern passenger facilities and an hourly handling figure of 800. For a regional city, that is a capacity statement: room for connecting traffic, festival surges and the cargo that tends to follow once frequencies rise.
Northeast air links after UDAN
The nod sits in a longer central drive. The UDAN regional connectivity scheme, launched in 2016, was built to put smaller cities on the air map, with the Northeast treated as priority geography. Since 2014, Cabinets have cleared several greenfield airports as part of a national aviation modernisation push.
The pattern is consistent: shrink the isolation of valley and hill towns, cut the clock to metros, and open space for trade, tourism and services. Assam residents, Northeast businesses and regional air passengers are the first in line. What follows now is the hard sequence — land, tenders, construction — and whether more Northeast airport files come behind this one.
If Dolu moves from Cabinet paper to concrete, Barak Valley's distance from the national air grid shrinks. The test is how quickly the first commercial flight follows the first brick.