CM Dhami Enters Tunnel as 3 Workers Remain Trapped in Chamoli
Synopsis
Key Takeaways
Seven workers are dead, three remain unaccounted for inside a debris-choked tunnel, and Uttarakhand Chief Minister Pushkar Singh Dhami walked into that tunnel himself on Friday, August 14, 2026 — not to inspect from a distance, but to see the rescue operation firsthand at Mayapur (Piplakoti) in Chamoli district. The Chief Minister's Office confirmed the visit as multi-agency teams race against time inside a structure that has already claimed seven lives.
What collapsed — and how deep the crisis runs
The tunnel in question is the TRT (Tail Race Tunnel) of THDC India Ltd's Vishnugad-Piplakoti Hydroelectric Project, a 444 MW under-construction power project in Chamoli. The tunnel stretches roughly 3 kilometres in total length. A landslide-triggered ingress of debris and water has compromised approximately 1.5 kilometres of that stretch — essentially half the structure.
Of the 22 workers trapped when the incident occurred, 19 have been brought out alive. The rescued injured have been transported to District Hospital Gopeshwar, where a medical team is monitoring them continuously. Three workers are still inside.
CM Dhami's ground-level command
District Magistrate Gaurav Kumar briefed Chief Minister Dhami on the sequence of events and the progress of rescue operations. Dhami then issued direct orders: the rescue mission must be treated as the highest priority, every available resource and technical capability must be deployed, and coordination between all agencies must not break down for a single moment.
The teams on the ground include NDRF (National Disaster Response Force), SDRF (State Disaster Response Force), ITBP (Indo-Tibetan Border Police), and local police — a standard but formidable multi-agency formation that Uttarakhand has deployed in previous tunnel emergencies. Dhami also directed officials to ensure no gap in care for the injured, support for victims' families, and logistics at the site.
Senior officials present included Disaster Secretary Vinod Kumar Suman, Garhwal Commissioner Anand Swaroop, IG Garhwal Rajeev Swaroop, and SP Surjit Singh Panwar, alongside district-level representatives and elected officials including Incharge Minister Bharat Choudhary and Tharali MLA Bhoopal Ram Tamta.
Chamoli's geological curse and the hydro imperative
This incident is not an isolated shock — it is the latest chapter in a long, difficult story. Chamoli district sits in one of the most geologically active corridors of the Himalayas, where landslides, flash floods, and ground subsidence regularly intersect with ambitious infrastructure. Uttarakhand has pursued hydroelectric development aggressively since its formation in 2000, betting on river potential for power and revenue. The Vishnugad-Piplakoti project is a flagship of that bet.
Multi-agency tunnel rescues have become almost a recurring protocol in this terrain — a testament both to the state's improving emergency response capacity and to the stubborn geological risk that no engineering plan has yet fully resolved.
Three lives, one tunnel, a race that cannot stop
With 19 rescued and 7 confirmed dead, the arithmetic of this disaster now hinges on three names officials have not yet been able to account for. Rescue teams continue to work through the debris-filled 1.5-kilometre section, and the Chief Minister has made clear: the operation does not stand down until every worker is found.
Uttarakhand's hydro ambitions will survive this crisis — but the three workers still inside that tunnel are the only number that matters right now.