Gaya MSME Technology Centre: ₹170 crore facility to be launched on 15 June

Share:
Audio Loading voice…
Gaya MSME Technology Centre: ₹170 crore facility to be launched on 15 June

Synopsis

A ₹170 crore MSME Technology Centre coming up in Gaya is the most significant industrial infrastructure push in southern Bihar in recent memory — covering six districts that have long been underserved. With AI, IoT, and Industry 4.0 labs alongside heavy engineering facilities, it signals a deliberate effort to future-proof small enterprise skilling in a region better known for migration than manufacturing.

Key Takeaways

Union MSME Minister Jitan Ram Manjhi and Bihar CM Samrat Choudhary will lay the foundation stone of the Gaya Technology Centre on 15 June .
The centre will be built at Khizarsarai, Gaya with a total investment of ₹170 crore — ₹86 crore in civil works and ₹84 crore in plant and machinery.
The facility spans 20 acres and approximately 16,800 sq metres of built-up area.
It will serve MSMEs across 6 districts : Gaya, Aurangabad, Nawada, Nalanda, Jehanabad, and Munger.
Training will cover AI, IoT, Data Analytics, Automation, VLSI , and traditional engineering and textile sectors.

Union MSME Minister Jitan Ram Manjhi and Bihar Chief Minister Samrat Choudhary will lay the foundation stone of a new Technology Centre at Khizarsarai in Gaya on 15 June, marking a significant push to strengthen the MSME ecosystem in southern Bihar. The centre, developed at an investment of ₹170 crore, is designed to deliver advanced manufacturing support, skill training, and technology services to local enterprises across six districts.

Project Scale and Infrastructure

The facility will come up on a 20-acre plot provided by the Bihar government, with a total built-up area of approximately 16,800 square metres. The investment is split between ₹86 crore for civil infrastructure and ₹84 crore for plant and machinery.

The campus will house a Production Block, Training Block, Utility Block, Administrative Block, Multipurpose Hall, Hostel, and Staff Accommodation — positioning it as a self-contained industrial training and manufacturing hub.

Services and Sectors Covered

The centre will focus on General Engineering, Heavy Engineering, and Textile Testing, directly catering to the industrial profile of the region. It will offer tool room facilities for moulds, dies, jigs, and fixtures; CNC machining services; CAD/CAM/CAE facilities; rapid prototyping; Industry 4.0 laboratories; and renewable energy systems.

Training programmes will span Artificial Intelligence, Internet of Things, Data Analytics, Automation, VLSI, Prototyping, Quality Control, and Textiles — a curriculum aligned with emerging industry demand rather than legacy trade skills alone.

Districts Set to Benefit

The centre is expected to serve MSMEs across Gaya, Aurangabad, Nawada, Nalanda, Jehanabad, and Munger districts. Southern Bihar has historically lagged in industrial infrastructure relative to the state's northern belt, and this facility is being positioned as a corrective measure.

This comes amid the Ministry of MSME's broader push to expand its nationwide network of Technology Centres and Extension Centres — institutions that support small enterprises through manufacturing access, advisory services, and skill development under the Aatmanirbhar Bharat framework.

Inauguration Details

The 15 June ceremony will begin with a traditional Bhoomi Pujan and will be attended by senior officials from the Ministry of MSME and the Bihar government. The announcement was made on Sunday, 14 June.

With the centre expected to plug critical gaps in skilled manpower and manufacturing access for small businesses, its execution timeline and capacity utilisation will be closely watched by industry bodies in the region.

Point of View

But southern Bihar's industrial deficit is structural — not one that a single facility, however well-equipped, can resolve alone. The more telling detail is the curriculum: AI, IoT, and VLSI alongside heavy engineering suggests the Ministry is trying to leapfrog legacy skilling models. Whether local MSMEs — many of them micro-enterprises with limited absorptive capacity — can actually leverage Industry 4.0 labs is the real question. Utilisation rates at existing Technology Centres across the country have been uneven, and Gaya's remoteness from major supply chains adds execution risk that the foundation-stone ceremony will not address.
NationPress
5 Aug 2026

Frequently Asked Questions

What is the MSME Technology Centre being set up in Gaya?
It is a ₹170 crore advanced manufacturing and skill development facility being built at Khizarsarai in Gaya, Bihar. The centre will provide CNC machining, CAD/CAM, Industry 4.0 labs, and training in AI, IoT, and engineering to local MSMEs across six districts.
Who will inaugurate the Gaya Technology Centre?
Union MSME Minister Jitan Ram Manjhi and Bihar Chief Minister Samrat Choudhary will lay the foundation stone on 15 June with a traditional Bhoomi Pujan. Senior officials from the Ministry of MSME and the Bihar government will also attend.
Which districts will benefit from the Gaya MSME Technology Centre?
The centre is designed to serve MSMEs in Gaya, Aurangabad, Nawada, Nalanda, Jehanabad, and Munger districts — covering a large swathe of southern Bihar that has historically lacked industrial infrastructure.
What is the investment breakdown for the Gaya Technology Centre?
The total investment is ₹170 crore — ₹86 crore allocated for civil infrastructure and ₹84 crore for plant and machinery. The Bihar government has provided a 20-acre plot for the project.
What training programmes will the Gaya Technology Centre offer?
The centre will run industry-oriented programmes in Artificial Intelligence, Internet of Things, Data Analytics, Automation, VLSI, Prototyping, Quality Control, General Engineering, Heavy Engineering, and Textiles — targeting both emerging technologies and the region's traditional industrial sectors.
Nation Press
The Trail

Connected Dots

Tracing the thread behind this story — newest first.

8 Dots
  1. Latest 1 week ago
  2. 1 month ago
  3. 1 month ago
  4. 1 month ago
  5. 1 month ago
  6. 1 month ago
  7. 1 month ago
  8. 1 month ago
Google Prefer NP
On Google