Ahmedabad's Geetamandir gets 39-platform North Block busport

Share:
Audio Loading voice…
Ahmedabad's Geetamandir gets 39-platform North Block busport

Synopsis

Ahmedabad's Geetamandir Bus Terminal just got a major upgrade: a brand-new North Block with 39 platforms, seating for hundreds, disability-friendly facilities, and a dedicated dormitory for GSRTC staff — all built under a public-private partnership. It signals a serious push to modernise Gujarat's busiest intercity bus hub.

Key Takeaways

Geetamandir Bus Terminal-2 (North Block) was inaugurated in Ahmedabad on 12 August by Deputy Chief Minister Harsh Sanghavi .
The terminal spans 4,309 square metres and features 39 boarding and alighting platforms.
Passenger waiting capacity totals over 570 seats across general, ladies', deluxe, and concourse areas.
Built under a PPP between GSRTC and Hubtown Bus Terminal (Ahmedabad) Pvt Ltd .
Three accessible toilets with bathrooms have been provided for passengers with disabilities.
A 255-square-metre dormitory on the third floor serves GSRTC drivers and conductors.

Ahmedabad's iconic Geetamandir Bus Terminal expanded significantly on Wednesday, 12 August with the inauguration of its new North Block — a modern 'Iconic Busport' featuring 39 boarding and alighting platforms and a comprehensive range of passenger amenities. The facility marks a major upgrade to one of Gujarat's busiest intercity bus hubs.

Key Developments

Deputy Chief Minister Harsh Sanghavi inaugurated the Geetamandir Bus Terminal-2 (North Block) and flagged off a fleet of newly built buses. Minister of State for Transport Pravin Mali and Minister of State for Urban Development Darshana Vaghela were also present at the ceremony, alongside city MLAs Amit Shah, Amit Thakor, Kaushik Jain, Amul Bhatt, Jitendra Patel, Alpesh Thakor, and Dinesh Kushwaha.

Infrastructure and Facilities

The new terminal has a total built-up area of 4,309 square metres and houses 39 platforms for boarding, alighting, and bus movements. Passenger services include three enquiry offices and ticketing counters spread over 218 square metres, a 39.38-square-metre Tourist Information Centre, a 45-square-metre cloakroom, a water room, a public addressing system, and a 333.50-square-metre store room.

Waiting facilities cater to varied needs: a general waiting hall seats 100 passengers, a dedicated ladies' waiting hall accommodates 75, and a deluxe waiting hall offers 25 seats. The boarding and alighting concourse adds another 370 seats across 412 square metres. A canteen with seating for 130 people and a 71.57-square-metre parcel room round out the passenger conveniences. A 3,000-square-metre BTF parking area has also been provided.

Inclusive and Staff Amenities

The terminal has been designed with accessibility in mind. Three special toilets with bathrooms have been provided for passengers with disabilities. Women's restroom facilities include 29 toilets and 7 bathrooms, while the men's section has 21 toilets, 5 bathrooms, and 33 urinals. A 255-square-metre rest room and dormitory on the third floor is reserved for GSRTC drivers and conductors.

PPP Model and Background

The project was developed under a public-private partnership (PPP) between the Gujarat State Road Transport Corporation (GSRTC) and Hubtown Bus Terminal (Ahmedabad) Pvt Ltd. Geetamandir has long served as a critical transit node connecting Ahmedabad with destinations across Gujarat and neighbouring states, and the North Block is intended to ease congestion and improve the overall passenger experience at the terminal.

What's Next

With the North Block now operational, authorities are expected to ramp up bus services through the expanded terminal. The upgrade positions Geetamandir as a model for modern, inclusive public transport infrastructure in Gujarat's urban centres.

Point of View

And this expansion directly addresses both. The inclusion of disability-accessible toilets and staff dormitories signals a more holistic approach to terminal design than past projects. The real test will be operational: whether the 39 new platforms genuinely decongest the existing terminal or simply shift the bottleneck.
NationPress
13 Aug 2026

Frequently Asked Questions

What is the new Geetamandir Bus Terminal North Block in Ahmedabad?
It is a newly constructed expansion of the existing Geetamandir Bus Terminal, officially called Geetamandir Bus Terminal-2 (North Block), inaugurated on 12 August in Ahmedabad. The facility features 39 boarding and alighting platforms, multiple waiting halls, ticketing counters, and disability-accessible amenities across 4,309 square metres.
Who inaugurated the Geetamandir Bus Terminal North Block?
Deputy Chief Minister Harsh Sanghavi inaugurated the terminal on Wednesday, 12 August, and flagged off newly built buses. Ministers of State Pravin Mali and Darshana Vaghela, along with several city MLAs, were also present at the ceremony.
How was the new Geetamandir terminal funded and built?
The project was developed under a public-private partnership (PPP) between the Gujarat State Road Transport Corporation (GSRTC) and Hubtown Bus Terminal (Ahmedabad) Pvt Ltd. This model allowed the terminal to be built without full dependence on public funds.
What passenger facilities are available at the new terminal?
The terminal offers a general waiting hall (100 seats), a ladies' waiting hall (75 seats), a deluxe waiting hall (25 seats), a concourse with 370 seats, a canteen for 130 people, a Tourist Information Centre, cloakroom, parcel room, three accessible toilets for passengers with disabilities, and a 3,000-square-metre parking area.
Why does the Geetamandir expansion matter for Ahmedabad commuters?
Geetamandir is one of Ahmedabad's primary intercity bus hubs, connecting the city to destinations across Gujarat and other states. The North Block's 39 additional platforms and expanded facilities are designed to reduce congestion and improve the travel experience for a large daily volume of passengers.
Nation Press
The Trail

Connected Dots

Tracing the thread behind this story — newest first.

8 Dots
  1. Latest 1 month ago
  2. 2 months ago
  3. 2 months ago
  4. 4 months ago
  5. 5 months ago
  6. 8 months ago
  7. 8 months ago
  8. 1 year ago
Google Prefer NP
On Google