Kishan Reddy: Cabinet okays ₹11,000-cr CIE manufacturing scheme

Share:
Audio Loading voice…
Kishan Reddy: Cabinet okays ₹11,000-cr CIE manufacturing scheme

Synopsis

Union Coal and Mines Minister G. Kishan Reddy said the Cabinet, chaired by PM Narendra Modi, approved an ₹11,000-crore CIE manufacturing scheme with sales-linked incentives and a testing-facility grant.

Key Takeaways

Union Coal and Mines Minister G.
Kishan Reddy on 25 November 2026 said the Union Cabinet, chaired by PM Narendra Modi, approved the CIE manufacturing ecosystem scheme.
He cited a financial outlay of ₹11,000 crore for the Scheme for Enhancement of Construction and Infrastructure Equipment Manufacturing Ecosystem.
Provisions listed include sales-linked incentives of 13% to 8% of incremental sales over five years.
The post also listed a grant of up to ₹375 crore for a CIE testing facility.
Reddy projected industry size rising from ₹97,500 crore in FY 2024–25 to ₹2.28 lakh crore by FY 2029–30, linking the move to Atmanirbhar Bharat and Viksit Bharat @2047.

India's earthmovers, cranes and road machines just became a Cabinet-scale industrial bet. Union Coal and Mines Minister G. Kishan Reddy on Wednesday, 25 November 2026, said the Union Cabinet, chaired by Prime Minister Narendra Modi, had approved a scheme to deepen domestic manufacturing of construction and infrastructure equipment, citing a financial outlay of ₹11,000 crore.

In a post on X, Reddy named the programme the 'Scheme for Enhancement of Construction and Infrastructure Equipment (CIE) Manufacturing Ecosystem'. He listed two headline provisions: sales-linked incentives of 13% to 8% of incremental sales value of eligible CIE equipment and components over five years, and a grant of up to ₹375 crore to set up a CIE testing facility.

Sales-linked incentives over five years

The structure Reddy described is familiar from the manufacturing playbook New Delhi has used since 2020: pay firms for extra output, not for promises on paper. Incentives, he said, would be tied to incremental sales of eligible machines and components, stepping down from 13% to 8% across five years.

That design is meant to pull more of the value chain — engines, hydraulics, undercarriages, control systems — onto Indian shop floors. Construction equipment is the hardware behind highways, metros, ports, airports and housing. When those machines are imported, so is the industrial margin.

A testing facility grant of up to ₹375 crore

Reddy also flagged a grant of up to ₹375 crore for a dedicated CIE testing facility. For capital-goods makers, a domestic lab is not a vanity project. It is where machines are certified, compared and cleared for tenders — the difference between assembling kits and owning a product standard.

What comes next is operational: scheme guidelines, where the testing campus is sited, and which manufacturers first claim the sales-linked payout. Those details will decide how fast the announcement turns into orders.

Jobs, exports and the Viksit Bharat @2047 frame

The minister projected India's CIE industry would grow from ₹97,500 crore in FY 2024–25 to ₹2.28 lakh crore by FY 2029–30. He argued the scheme would strengthen domestic manufacturing, generate employment and lift India's competitiveness in the global CIE market, tying it to Atmanirbhar Bharat and the Viksit Bharat @2047 vision.

Since 2020, targeted incentive schemes have been rolled out across manufacturing and capital goods to scale production and cut import dependence. Construction equipment sits at the junction of that industrial push and India's infrastructure build-out. The Cabinet has now put a numbered scheme on that junction. Guidelines, the test-bed location and the first incentive claims will show whether the machines follow the money.

Point of View

CIE becomes another test of whether PLI-style schemes can move a tender-driven sector up the value chain before 2047.
NationPress
25 Nov 2026

Frequently Asked Questions

What Cabinet scheme did G. Kishan Reddy announce?
He said the Union Cabinet approved the Scheme for Enhancement of Construction and Infrastructure Equipment (CIE) Manufacturing Ecosystem, citing an outlay of ₹11,000 crore.
What incentives did Kishan Reddy list for CIE makers?
The post listed sales-linked incentives ranging from 13% to 8% of incremental sales value of eligible CIE equipment and components over five years.
How much did the post say is earmarked for a CIE testing facility?
Reddy said the scheme includes a grant of up to ₹375 crore for setting up a CIE testing facility.
What industry growth figures did the minister cite?
He projected India's CIE industry would grow from ₹97,500 crore in FY 2024–25 to ₹2.28 lakh crore by FY 2029–30.
Who chaired the Cabinet meeting mentioned in the post?
Reddy said the Union Cabinet was chaired by Prime Minister Narendra Modi.
Nation Press
The Trail

Connected Dots

Tracing the thread behind this story — newest first.

8 Dots
  1. Latest 39 min ago
  2. 1 hour ago
  3. 1 hour ago
  4. 1 hour ago
  5. 1 hour ago
  6. 3 hours ago
  7. 4 hours ago
  8. 5 hours ago
Google Prefer NP
On Google