Kishan Reddy Updates PM Modi on Telangana Station Redevelopment

Share:
Audio Loading voice…
Kishan Reddy Updates PM Modi on Telangana Station Redevelopment

Synopsis

Union Minister G. Kishan Reddy tagged PM Modi on 31 July 2026 with a detailed progress update on a Telangana railway station redevelopment under the Amrit Bharat Stations scheme, listing completed south-side works and ongoing north-side construction including a metro skywalk and air concourse.

Key Takeaways

Kishan Reddy posted a structured redevelopment progress update tagging PM Narendra Modi on 31 July 2026 .
The station will feature 26 lifts , 32 escalators , a two-level air concourse, multi-level parking, solar power, and EV charging.
Completed works include the south station building , Kazipet-end Foot Over Bridge, RPF building, and south arrival area.
Ongoing works include the north station building , air concourse, metro connectivity skywalk, and a Sewage Treatment Plant.
The project aligns with the Amrit Bharat Stations scheme launched in 2023 to redevelop over 1,300 stations nationwide.
Metro skywalk integration signals Telangana's inclusion in India's inter-modal transit modernisation push.

A Telangana railway station is being rebuilt from the ground up — and Union Coal and Mines Minister G. Kishan Reddy wants Prime Minister Narendra Modi to see every detail. On 31 July 2026, Reddy posted a structured progress update on X, tagging the Prime Minister directly with a granular breakdown of completed and ongoing works at what context clues — Kazipet-end and Hyderabad-end references — place firmly in Telangana.

What Is Being Built: A Station Reimagined

The project is no ordinary renovation. The planned facility includes iconic station buildings, a two-level air concourse, a through-roof cover over platforms, 26 lifts and 32 escalators, multi-level parking, solar power generation, EV charging points, and advanced security systems. A skywalk will link the station directly to the metro network — a signature feature of India's push toward seamless inter-modal transit hubs.

The scale places this redevelopment squarely within the Amrit Bharat Stations scheme, launched in 2023 to overhaul more than 1,300 stations across the country with exactly this kind of multi-modal, green-energy-integrated infrastructure.

What Is Done, What Is Still Rising

Reddy's update draws a clear line between what passengers can already count on and what is still taking shape. On the completed side: a Temporary Booking Office, a Railway Protection Force building, the Kazipet-end Foot Over Bridge, the south station building, south-side approach roads, south-side basement works, and the south arrival area.

Under active construction: the north multi-level parking facility, the north station building, the air concourse, cover-over-platform works, the Hyderabad-end Foot Over Bridge, travelator-integrated FOBs, underground water tanks, a Sewage Treatment Plant, and the metro connectivity skywalk. The north side, in other words, is where the story is still being written.

Telangana's Place in the Railway Modernisation Push

For Reddy — who holds the Coal and Mines portfolio at the Centre and leads the BJP in Telangana — flagging this project to the Prime Minister is as much political optics as it is administrative update. Telangana commuters have long demanded infrastructure parity with metro cities, and a fully redeveloped junction with metro linkage and green energy features would be a visible, tangible answer to that demand.

Indian Railways has been threading together urban metro grids and intercity rail at key junctions nationwide. A station with a dedicated skywalk to the metro system is no longer an exception — it is becoming the benchmark.

When the north side rises to meet the south, Telangana will have a station built for the next generation of Indian rail travel — and the minister is making sure the Prime Minister is watching it happen in real time.

Point of View

Not just an administrative update, underlining the BJP's effort to claim visible infrastructure wins in Telangana ahead of any electoral cycle. The Amrit Bharat Stations scheme has become a key vehicle for the Centre to demonstrate tangible governance at the constituency level, and granular progress reports of this kind are a deliberate part of that communication strategy. The metro skywalk element is particularly significant: it signals that the Centre is treating Telangana's rail nodes as part of a larger urban mobility grid, not standalone projects. Watch for a formal inauguration event once north-side works conclude — these milestones rarely go unmarked.
NationPress
31 Jul 2026

Frequently Asked Questions

Which railway station is being redeveloped by Kishan Reddy?
The post does not name the station explicitly, but references to the Kazipet-end and Hyderabad-end Foot Over Bridges place the project in Telangana, most likely at or near Kazipet Junction.
What is the Amrit Bharat Stations scheme?
The Amrit Bharat Stations scheme was launched in 2023 to modernise over 1,300 Indian railway stations with upgraded concourses, lifts, escalators, solar power, and metro connectivity.
What facilities will the redeveloped Telangana station have?
The station will include a two-level air concourse, 26 lifts, 32 escalators, multi-level parking, solar power, EV charging, advanced security systems, and a metro connectivity skywalk.
What construction work is still pending at the station?
Ongoing works include the north station building, north multi-level parking, air concourse, cover-over-platform, Hyderabad-end Foot Over Bridge, travelator-integrated FOBs, underground water tanks, a Sewage Treatment Plant, and the metro skywalk.
Why did Kishan Reddy tag PM Modi in the railway update?
As BJP Telangana state president and a Union Minister, Reddy regularly updates PM Modi on infrastructure progress in the state, using such posts to highlight Central government development work in Telangana.
Nation Press
The Trail

Connected Dots

Tracing the thread behind this story — newest first.

8 Dots
  1. Latest 1 hour ago
  2. 1 week ago
  3. 1 week ago
  4. 2 weeks ago
  5. 1 month ago
  6. 1 month ago
  7. 2 months ago
  8. 2 months ago
Google Prefer NP
On Google