Mettur dam at 89.72 ft: Can 52 TMC sustain Tamil Nadu's 45-day samba release?

Share:
Audio Loading voice…
Mettur dam at 89.72 ft: Can 52 TMC sustain Tamil Nadu's 45-day samba release?

Synopsis

Tamil Nadu's samba season is under threat before it begins. With Mettur dam at just 89.72 feet and 52.33 TMC in storage, delta farmers warn the reservoir cannot sustain the 15,000–20,000 cusec daily discharge needed for 45 days — and a failed kuruvai season, a weak Southwest monsoon, and an uncertain Northeast monsoon have left no safety net.

Key Takeaways

Mettur dam stood at 89.72 feet with 52.33 TMC of storage as of Friday evening, just ahead of the planned 1 September opening for samba irrigation.
Joseph Vijay is scheduled to inaugurate the release in person on 1 September .
Farmers say a daily discharge of 15,000–20,000 cusecs is needed to reach tail-end areas, which they argue current storage cannot sustain for 45 days .
An estimated 268.47 TMC is required to irrigate 12.10 lakh acres across delta districts between 15 September and 28 January .
Kuruvai cultivation area fell from 5.66 lakh acres to 3.78 lakh acres this year after the dam could not be opened on the customary 12 June date.
Farmer groups have urged the government to delay the opening to 15 September to conserve storage until Northeast monsoon inflows begin.

Delta farmers in Tamil Nadu have raised serious doubts over whether the Mettur reservoir's current storage of 52.33 thousand million cubic feet (TMC) — with the dam level at 89.72 feet as of Friday evening — will be sufficient to sustain the state government's proposed 45-day water release for the samba cultivation season. The Tamil Nadu government has announced that the dam will be opened on 1 September, with Chief Minister C. Joseph Vijay scheduled to inaugurate the release in person.

What the Numbers Say

For Cauvery water to reach tail-end irrigation areas, farmers say a daily discharge of between 15,000 and 20,000 cubic feet per second (cusecs) would be necessary. At the current storage levels, farmers contend this rate of release cannot be sustained for the full announced period. An estimated 268.47 TMC of water is required to irrigate 12.10 lakh acres across the delta districts between 15 September and 28 January — a figure that underscores the scale of the shortfall concern.

A Season Already Under Stress

The anxiety over samba comes on the heels of a severely disrupted kuruvai cultivation season. Traditionally, the Mettur dam is opened on 12 June each year to support kuruvai paddy. This requires the dam level to be at or above 90 feet. At the start of June this year, the level stood at only 79 feet, forcing authorities to skip the customary opening date. Farmers dependent on Cauvery water could not undertake kuruvai cultivation, while those with access to groundwater proceeded independently. As a result, the area under kuruvai cultivation fell sharply — from 5.66 lakh acres last year to 3.78 lakh acres this year, a decline of roughly 33%.

The Monsoon Factor

Compounding the concern is inadequate rainfall during the Southwest monsoon season. Farmers and agriculture observers are now looking anxiously toward the Northeast monsoon, expected to set in towards the end of October, but there is no certainty over whether it will bring sufficient inflows to replenish the reservoir in time. The thirteen Cauvery delta districts — including Thanjavur, widely regarded as Tamil Nadu's rice bowl — are heavily dependent on Mettur dam water for irrigation, leaving little buffer if monsoon inflows disappoint.

Farmers Urge Two-Week Delay

In view of the storage deficit and monsoon uncertainty, farmer groups have formally suggested that the dam opening be postponed from 1 September to 15 September. They argue that a two-week delay would conserve existing storage and help bridge the gap until Northeast monsoon inflows begin to augment the reservoir. The state government has not yet indicated whether it will reconsider the announced date, and preparations for the 1 September inauguration are reportedly continuing as planned.

What Happens Next

With Chief Minister Vijay's visit to the dam site scheduled for 1 September, all eyes are on whether the government will announce any revision to the release plan or address farmers' concerns about storage adequacy. The coming weeks — and the Northeast monsoon's performance — will determine whether the samba season can recover the ground lost during a difficult kuruvai cycle.

Point of View

Not a one-season anomaly. A dam that missed its June opening threshold by 11 feet, a kuruvai crop area down by a third, and now a samba season launched on storage that farmers say is mathematically inadequate — this is what chronic Cauvery water insecurity looks like at ground level. The government's decision to proceed with the September 1 date despite these numbers suggests political optics are weighing heavily; inaugurating a dam opening is a visible act, postponing it is not. The harder question — whether Tamil Nadu's delta agriculture needs a structural rethink of cropping calendars in the face of increasingly erratic monsoons — is one no political announcement at a dam site will answer.
NationPress
29 Aug 2026

Frequently Asked Questions

What is the current water level at Mettur dam ahead of the samba season release?
As of Friday evening, the Mettur dam level stood at 89.72 feet with a storage of 52.33 TMC. Farmers warn this is insufficient to sustain the government's planned 45-day release at the required daily discharge rates.
Why could the Mettur dam not be opened on June 12 this year for kuruvai cultivation?
The dam requires a minimum level of 90 feet for the customary June 12 opening. At the start of June this year, the level was only 79 feet, forcing authorities to skip the scheduled release. This caused kuruvai cultivation area to drop from 5.66 lakh acres last year to 3.78 lakh acres this year.
Why are Tamil Nadu delta farmers asking for the dam opening to be postponed to September 15?
Farmers believe a two-week delay would conserve existing storage and help bridge the gap until Northeast monsoon inflows begin replenishing the reservoir in late October. They argue the current 52.33 TMC cannot sustain the 15,000–20,000 cusec daily discharge needed for 45 days.
How much water is needed for samba cultivation across Tamil Nadu's delta districts?
An estimated 268.47 TMC of water is required to irrigate 12.10 lakh acres across the thirteen Cauvery delta districts between September 15 and January 28, according to farmer estimates cited in reports.
Which districts depend on Mettur dam for irrigation?
Thirteen Cauvery delta districts depend on the Mettur dam for irrigation, including Thanjavur, widely known as Tamil Nadu's rice bowl. These districts have no significant alternative water source for large-scale paddy cultivation.
Nation Press
The Trail

Connected Dots

Tracing the thread behind this story — newest first.

8 Dots
  1. Latest 3 days ago
  2. 5 days ago
  3. 2 months ago
  4. 2 months ago
  5. 3 months ago
  6. 3 months ago
  7. 8 months ago
  8. 1 year ago
Google Prefer NP
On Google