Sealdah Division gears up for Durga Puja 2025: 21 lakh daily passengers expected

Share:
Audio Loading voice…
Sealdah Division gears up for Durga Puja 2025: 21 lakh daily passengers expected

Synopsis

With Durga Puja 2025 under two months away, Eastern Railway's Sealdah Division is pulling out all the stops — round-the-clock ticketing, HHT-equipped staff in crowds, CCTV density monitoring, and infrastructure overhauls from Barrackpore to Dum Dum. The trigger: a single-day peak of 21 lakh passengers last year that exposed every gap in the system.

Key Takeaways

Eastern Railway's Sealdah Division held a high-level preparedness review on 27 August for Durga Puja 2025 .
Peak footfall last year reached approximately 21 lakh passengers in a single day at Sealdah.
All ticket counters at Sealdah and Kolkata stations will operate round the clock , with HHT-equipped staff deployed in crowds.
The new Central Gate at Sealdah will serve as a dedicated entry/exit for mail and express passengers.
Infrastructure upgrades are underway at Barrackpore , Dum Dum , Ballygunge , and Bidhannagar stations.
CCTV-based crowd monitoring and full emergency response drills are part of the preparedness plan.

The Sealdah Division of Eastern Railway (ER) has launched full-scale preparations for the Durga Puja 2025 festive rush, convening a high-level review meeting on Thursday, 27 August to coordinate crowd management, infrastructure upgrades, and emergency response across key stations in Kolkata and its suburbs. The division recorded a peak footfall of approximately 21 lakh passengers in a single day during last year's Durga Puja — a benchmark that is now driving every aspect of this year's planning.

High-Level Review Meeting

Rajeev Saxena, Divisional Railway Manager, Sealdah, chaired the preparedness meeting via video conference, with branch officers, station officials, and frontline field supervisors in attendance. The session was designed to gather ground-level feedback, identify practical challenges, and ensure all departments are aligned before the festive period begins. Saxena emphasised that all infrastructure works must remain passenger-centric and be completed well ahead of the Puja rush.

Crowd Management and Ticketing Measures

A detailed platform-wise assessment of passenger holding capacity, platform length, and train operations is underway to prevent overcrowding. All ticket counters at Sealdah and Kolkata stations will operate round the clock, with additional booking clerks deployed during peak morning and evening hours. Automatic Ticket Vending Machines (ATVMs) with facilitators will run continuously, and staff equipped with Hand-Held Terminals (HHTs) will be deployed within crowds to issue on-the-spot tickets, reducing queue pressure at counters.

Adequate signage and Train Information Boards (TIBs) are being installed for clearer passenger guidance. Railway Protection Force (RPF) personnel will regulate queues and passenger movement, supported by public announcements and coordination from the commercial department. CCTV-based monitoring will be used extensively to track crowd density and enable early intervention.

Infrastructure Upgrades Across Stations

The newly opened Central Gate at Sealdah is being designated as a dedicated entry and exit point for mail and express passengers, reducing cross-movement within the station. At Dum Dum, booking counters near platforms 4 and 5 are being dismantled to create a larger passenger circulation area. At Barrackpore, a newly constructed ticket booking counter will be opened and additional ticketing and circulation facilities are being created. The Foot Overbridge (FOB) at the Ranaghat end at Barrackpore is nearing completion and will be commissioned at the earliest to ease pressure on the central FOB.

Modern toilet complexes are being arranged at Sealdah, Ballygunge, and Dum Dum stations to improve hygiene and passenger convenience. Corrective works at the Bidhannagar subway are also underway to ensure safer movement. Approach roads at level crossing gates are being strengthened to facilitate smoother traffic flow.

Emergency Preparedness and Staff Training

Emergency routes, evacuation arrangements, medical assistance, and disaster-response measures are all being reviewed ahead of the festival. Employees and supervisors across departments are being briefed and trained on disaster management, emergency response protocols, and their individual responsibilities during the festive rush. This is the second consecutive year the Sealdah Division has conducted such structured pre-Puja preparedness reviews.

'Through coordinated planning, infrastructure improvements, enhanced ticketing facilities, modern passenger amenities, crowd-control measures and strengthened emergency preparedness, the Sealdah Division is committed to ensuring a safe, well-managed and passenger-friendly Puja experience for lakhs of commuters and pandal hoppers,' Saxena said. With Durga Puja less than two months away, the pace of ground-level execution will determine whether the division can match — or surpass — the operational standards set last year.

Point of View

But the real question is execution lag: infrastructure works at Barrackpore and Bidhannagar are still 'nearing completion' with under two months to go. Eastern Railway has a pattern of announcing robust festive plans; the gap between the review room and the platform is where passengers feel the difference. The deployment of HHTs and round-the-clock ATVMs is a genuine improvement, but crowd-density CCTV monitoring is only as good as the response time it triggers — and that depends on staffing levels that the division has not publicly committed to.
NationPress
27 Aug 2026

Frequently Asked Questions

Why is Eastern Railway's Sealdah Division preparing early for Durga Puja 2025?
The Sealdah Division is preparing early because last year's Durga Puja saw a peak footfall of approximately 21 lakh passengers in a single day, making advance planning essential to prevent overcrowding and ensure passenger safety.
What ticketing facilities will be available at Sealdah during Durga Puja?
All ticket counters at Sealdah and Kolkata stations will operate round the clock, with additional booking clerks during peak hours. Automatic Ticket Vending Machines with facilitators and staff with Hand-Held Terminals will also be deployed in crowds to issue on-the-spot tickets.
Which stations are getting infrastructure upgrades ahead of Durga Puja 2025?
Key upgrades are underway at Sealdah, Dum Dum, Barrackpore, Ballygunge, and Bidhannagar. Works include a new Foot Overbridge at Barrackpore, dismantling of counters at Dum Dum to create more space, modern toilet complexes, and subway improvements at Bidhannagar.
How will crowd management be handled at Sealdah during the Puja rush?
CCTV-based monitoring will track crowd density and enable early intervention. RPF personnel will regulate queues, supported by public announcements. The newly opened Central Gate will serve as a dedicated entry and exit for mail and express passengers to reduce cross-movement.
When is Durga Puja 2025 and how much time does Eastern Railway have to prepare?
Durga Puja 2025 is less than two months away from the review meeting held on 27 August. Eastern Railway has stated that all essential infrastructure works are targeted for completion well ahead of the festival.
Nation Press
The Trail

Connected Dots

Tracing the thread behind this story — newest first.

8 Dots
  1. Latest 4 hours ago
  2. 2 weeks ago
  3. 1 month ago
  4. 4 months ago
  5. 10 months ago
  6. 10 months ago
  7. 11 months ago
  8. 1 year ago
Google Prefer NP
On Google