CM Dhami clears ₹500 cr+ for schools, Kumbh 2027, roads
Synopsis
Key Takeaways
In a single sweeping administrative session on Friday, October 23, 2026, Chief Minister Pushkar Singh Dhami of Uttarakhand approved a sprawling basket of public-expenditure orders — spanning teacher salaries, Kumbh Mela 2027 preparations in Haridwar, rural road upgrades across six districts, helipads, a tube-well, and a temple complex — with the combined outlay running well past ₹500 crore. The scale and breadth of a single day's approvals offer a compressed portrait of how a hill state juggles mass-event logistics, routine connectivity gaps, and foundational education dues all at once.
₹445.92 crore unlocked for teachers under Samagra Shiksha
The single largest sanction of the day was also the most overdue: ₹445.92 crore in arrear salary and allowance payments for teachers and staff employed under the Samagra Shiksha Yojana — the Centre's integrated school-education umbrella scheme covering elementary through secondary stages, including teacher-education institutions. Samagra Shiksha, operational since 2018–19 as a merger of the earlier Sarva Shiksha Abhiyan and Rashtriya Madhyamik Shiksha Abhiyan, channels both central and state funds for salaries, infrastructure, and learning outcomes. Releasing arrear salary funds of this magnitude signals that a significant backlog had accumulated for teachers working under the scheme in the state's government secondary and elementary schools — a relief that will directly reach classrooms across Uttarakhand's mountainous terrain.
Kumbh Mela 2027: Kangra Ghat and logistics funding approved
Kumbh Mela 2027, slated for Haridwar, received two dedicated approvals. Chief Minister Dhami sanctioned ₹8.43 crore for the expansion of Kangra Ghat, located on the right bank of the Ganga Canal in Bahadurabad development block of Haridwar district — a key bathing and congregation point that needs capacity upgrades ahead of the expected surge in pilgrims. Alongside this, the Finance Committee's recommended cost of ₹14.57 crore for rental furniture and decorative fabrics for the Kumbh grounds was cleared. The Kumbh Mela at Haridwar is one of India's largest periodic religious gatherings, drawing tens of millions of visitors, and infrastructure preparation typically begins years in advance.
Mountain roads, helipads, and a tube-well: district-by-district approvals
The bulk of the remaining orders target road connectivity — a perennial priority for Uttarakhand's remote hilly blocks where poor access compounds development deficits:
- Tehri Garhwal: ₹2.04 crore for a new motor road from Jakhed to Sumadi Kaproli in Kirti Nagar block; and ₹98.77 lakh for a dharamshala (rest house), rooms, toilets, and beautification near Huneshwar Mahadev Temple.
- Pithoragarh: ₹4.09 crore for extension, improvement, and black-topping of the Ganai Bankot – Bhattighon Tarsimoli motor road; ₹61.39 lakh for a 1.5-km cement-concrete village link road from Dhungalgaon to Ojhatalala in Kanalichhina block.
- Nainital: ₹3.82 crore for improvement and PC black-topping on the Kasiyalekh Harinagar Aksoda motor road (km 1–8); ₹8.30 lakh for a new helipad at Daun Parewa.
- Udham Singh Nagar: ₹3.84 crore for a 6-km hot-mix road from a food warehouse through Talwar Farm to Vakil Farm in Pratappur village; ₹87.94 lakh for road reconstruction in Surendranagar village.
- Champawat: ₹46.46 lakh for a 1,000-metre interlocking-tile pathway with boundary wall leading to Government Inter College Mulakot in Lohaghat constituency; ₹4.94 crore for improvement and black-topping of NH-57 segments (km 17–21 and km 27–38.120) in Barakot block.
- Pauri Garhwal: ₹13.50 lakh for a helipad near the PWD Guest House in Rikhanikhal block, Lansdowne constituency.
- Dehradun: ₹1.91 crore for maintenance of the Udpalta-Uparauli motor road in Kalsi block; ₹3.07 crore for one tube-well, pump house, rising main, and related works in Cantonment Zone 5.
Individually modest, these district-level orders collectively knit together hill villages that would otherwise remain cut off — particularly critical during the monsoon season when landslides can sever links for weeks. The simultaneous helipad approvals in Pauri Garhwal and Nainital underline the state's continued reliance on air access as an emergency and administrative lifeline in terrain where road construction is expensive and slow.
With Kumbh 2027 now firmly on the funding calendar and the ₹445.92-crore education salary release clearing a long-standing dues backlog, the pressure on Uttarakhand's treasury is only going to intensify — making every rupee of efficient project execution count.