CM Dhami Clears Rs 22.97 Cr for Water, Rivers, Schools in Uttarakhand

Share:
Audio Loading voice…
CM Dhami Clears Rs 22.97 Cr for Water, Rivers, Schools in Uttarakhand

Synopsis

Chief Minister Pushkar Singh Dhami on 8 July 2026 approved Rs 22.97 crore for water supply, sewerage, river rejuvenation, lab equipment, lake protection, temple infrastructure and a girls' college boundary wall across six Uttarakhand districts.

Key Takeaways

Rs 1.43 crore sanctioned for construction of 200 handpumps in Bhagwanpur assembly constituency , Haridwar district.
Rs 3.16 crore approved for Roorkee city sewerage and Rs 4.50 crore for replacing damaged pipelines in New Haridwar Model Colony and Govindpuri .
Rs 2.54 crore cleared for automatic analyser systems in district laboratories across Garhwal and Kumaon divisions.
Rs 6.02 crore and Rs 4.17 crore sanctioned for rejuvenation of the Gadul River (Dehradun) and Kamal Ganga River (Uttarkashi) respectively.
Rs 74.38 lakh approved for Okhaldhunga Lake development in Champawat ; religious and cultural sites in Udham Singh Nagar and Almora receive a combined Rs 1.29 crore .
Rs 53.18 lakh sanctioned for boundary wall of Lala Om Prakash Gyandeep Kanya Inter College , Laldhaang, Haridwar.

Chief Minister Pushkar Singh Dhami of Uttarakhand approved a clutch of infrastructure sanctions on Wednesday, 8 July 2026, releasing a combined Rs 22.97 crore across water supply, sewerage, river rejuvenation, lake protection, religious sites and school construction spread over multiple districts of the state.

Context

The Chief Minister's Office announced the approvals covering six districts — Haridwar, Dehradun, Uttarkashi, Champawat, Udham Singh Nagar and Almora. The sanctions span a wide range of civic and cultural needs, from rural handpumps to urban sewerage and from Himalayan river treatment to temple beautification.

The largest single allocation is Rs 6.02 crore for the rejuvenation and treatment of the Gadul River (a tributary of the Saung River) in Dehradun district, followed by Rs 4.50 crore for replacing damaged distribution pipelines in New Haridwar Model Colony and Govindpuri.

Policy Backdrop

The water-supply and handpump components align with the Jal Jeevan Mission, the central scheme launched in 2019 to provide tap-water connections to every rural household. The approval of 200 handpumps in the Bhagwanpur assembly constituency of Haridwar district at a cost of Rs 1.43 crore reflects the mission's continued push into semi-urban and peri-urban pockets.

River rejuvenation funding echoes the Namami Gange programme, under which Uttarakhand has received successive tranches since 2014 for tributary cleaning, ghat development and riparian treatment. The Rs 4.17 crore sanctioned for the Kamal Ganga River in Uttarkashi extends this work to a Garhwal Himalayan watercourse. Separately, Rs 3.16 crore was cleared for the Roorkee city sewerage system, addressing long-standing urban sanitation gaps in the industrial town.

The approval of Rs 2.54 crore for automatic analyser systems in district-level laboratories across the Garhwal and Kumaon divisions is aimed at strengthening standards-testing capacity — a step that supports quality assurance for water and food safety across the state.

Stakeholders and Impact

Rural households in Bhagwanpur stand to gain the most immediately, with 200 new handpumps set to improve drinking-water access in an area that has historically relied on groundwater infrastructure. Urban residents of Roorkee and localities in Haridwar will benefit from upgraded sewerage and pipeline networks.

The Rs 74.38 lakh sanctioned for protective and development works at Okhaldhunga Lake in Champawat is expected to support local ecology and nascent tourism. Religious communities receive attention through Rs 56.51 lakh for the beautification of the newly built Durga Temple in Bengali Colony, Nanakmatta (Udham Singh Nagar), and Rs 72.83 lakh for a dharamshala (rest house) at the Maa Mangala Bhagwati Mata Temple complex in Seraghat, Almora. Students in Haridwar will see a concrete benefit from Rs 53.18 lakh approved for a boundary wall at Lala Om Prakash Gyandeep Kanya Inter College under Nyaya Panchayat Laldhaang.

What's Next

The approvals now move to the tendering and procurement stage across the respective district administrations. River-treatment projects in Dehradun and Uttarkashi typically involve multi-agency coordination between state irrigation, forest and environment departments, which can affect timelines.

Progress on these sanctions will be a marker for the state government's infrastructure delivery ahead of the next assembly session, where supplementary budget demands for ongoing works are expected. The automatic analyser procurement for Garhwal and Kumaon laboratories will also be watched as a signal of the state's commitment to regulatory and quality-testing infrastructure.

Point of View

Environmental and religious infrastructure — into single releases, maximising visibility across multiple assembly segments simultaneously. The inclusion of river-rejuvenation funds for both Garhwal and Kumaon divisions signals an effort to balance regional sentiment in a state where the hills-plains divide has historically shaped electoral calculus. The lab-analyser procurement is a quiet but significant investment in state regulatory capacity that often goes unnoticed alongside more visible brick-and-mortar works. With assembly dynamics always in the backdrop, such multi-district release orders serve both a governance function and a political signalling role.
NationPress
8 Jul 2026

Frequently Asked Questions

How much money did CM Dhami sanction on 8 July 2026?
Chief Minister Pushkar Singh Dhami approved a total of approximately Rs 22.97 crore across multiple projects in Haridwar, Dehradun, Uttarkashi, Champawat, Udham Singh Nagar and Almora districts.
What is the Gadul River project in Dehradun?
The Gadul River is a tributary of the Saung River in Dehradun district . The state government has sanctioned Rs 6.02 crore for its rejuvenation and treatment works, which include environmental restoration and river-management interventions.
What are the handpump projects in Haridwar under this sanction?
200 new handpumps are to be constructed in the Bhagwanpur assembly constituency of Haridwar district at a cost of Rs 1.43 crore , aimed at improving rural and peri-urban drinking-water access.
What is the Roorkee sewerage project approved by CM Dhami?
Rs 3.16 crore has been sanctioned for the Roorkee city sewerage system to address urban sanitation needs in the major town located in Haridwar district.
Why are automatic analyser systems being procured for Uttarakhand labs?
The state government has approved Rs 2.54 crore to purchase automatic analyser systems for district-level laboratories in the Garhwal and Kumaon divisions to strengthen standards-testing and quality-assurance capacity across the state.
Nation Press
The Trail

Connected Dots

Tracing the thread behind this story — newest first.

8 Dots
  1. Latest 23 hours ago
  2. 6 days ago
  3. 1 week ago
  4. 2 weeks ago
  5. 2 weeks ago
  6. 1 month ago
  7. 1 month ago
  8. 1 month ago
Google Prefer NP
On Google