Jaipur Metro Phase-II: A 41-Km Corridor with 36 Stations to Alleviate City Congestion

Share:
Audio Loading voice…
Jaipur Metro Phase-II: A 41-Km Corridor with 36 Stations to Alleviate City Congestion

Synopsis

Jaipur's new 41-km metro corridor is set to revolutionize public transport, connecting key areas and ensuring efficient mobility. Chief Minister Bhajanlal Sharma calls it the city's lifeline for industrial and residential connectivity.

Key Takeaways

41-km corridor from Prahladpura to Todi Mod.
36 stations planned for efficient transport.
Estimated cost: over Rs 13,037 crore.
Project aims to alleviate traffic congestion.
Boosts economic development and job creation.

Jaipur, April 9 (NationPress) A newly sanctioned 41-kilometre North-South metro corridor stretching from Prahladpura to Todi Mod is set to transform Jaipur’s public transport under Phase-II of the metro initiative. Chief Minister Bhajanlal Sharma has hailed this corridor as the city’s essential lifeline, linking vital industrial and residential areas from Sitapura to VKIA, thereby promoting safe, efficient, and user-friendly transport options.

The ambitious project, with an estimated budget exceeding Rs 13,037 crore, will feature 36 stations and will be carried out by the Rajasthan Metro Rail Corporation Limited (RMRCL), a collaborative venture equally supported by the central and state governments, as per official statements.

According to Sharma, “This corridor will serve as Jaipur’s lifeline, facilitating connections between key industrial and residential zones from Sitapura to VKIA, ensuring safe, efficient, and convenient transport for residents.”

The infrastructure will enhance connectivity to significant locations, encompassing the Sitapura Industrial Area, VKIA, Jaipur Airport, Tonk Road, SMS Hospital, Ambabari, and Vidhyadhar Nagar. Plans include underground stations in the airport vicinity to foster an integrated metro framework.

At present, Jaipur Metro’s Phase I covers 11.64 km from Mansarovar to Badi Chaupar with 11 stations. The forthcoming phase is expected to vastly improve connectivity, alleviate traffic congestion, and fortify Jaipur’s urban transport system. Recently, the Union Cabinet approved the Jaipur Metro Phase-II, alongside the Cabinet Committee on Economic Affairs which sanctioned the revised cost for the Pachpadra Refinery.

The new corridor will ensure seamless access to critical locations such as the Sitapura Industrial Area, VKIA, Jaipur Airport, Tonk Road, SMS Hospital, Ambabari, and Vidhyadhar Nagar, with planned underground stations in the airport zone for an integrated metro network.

Additionally, the Cabinet Committee has greenlit a revised expenditure of Rs 79,459 crore for the HPCL Rajasthan Refinery at Pachpadra.

Sharma noted that the refinery project would stimulate industrial growth and create over 25,000 direct and indirect jobs, significantly contributing to the economic development of the state.

The Chief Minister referred to these decisions as historic, expressing gratitude to the Prime Minister, asserting that they would fast-track the state's comprehensive development.

Point of View

Offering a robust solution to congestion while fostering economic growth. This initiative is poised to enhance connectivity and reduce travel times significantly, reflecting a proactive approach to urban planning.
NationPress
2 Aug 2026

Frequently Asked Questions

What is the length of the Jaipur Metro Phase-II corridor?
The Jaipur Metro Phase-II corridor will be 41 kilometres long.
How many stations will the new metro corridor have?
The new corridor will consist of 36 stations.
What is the estimated cost of the Jaipur Metro Phase-II project?
The estimated cost of the project is over Rs 13,037 crore.
Who is implementing the Jaipur Metro Phase-II?
The project will be implemented by the Rajasthan Metro Rail Corporation Limited (RMRCL).
What key areas will the metro corridor connect?
It will connect Sitapura, VKIA, Jaipur Airport, and other significant locations.
Nation Press
The Trail

Connected Dots

Tracing the thread behind this story — newest first.

8 Dots
  1. Latest 1 week ago
  2. 1 week ago
  3. 1 week ago
  4. 4 weeks ago
  5. 4 weeks ago
  6. 4 weeks ago
  7. 3 months ago
  8. 3 months ago
Google Prefer NP
On Google