Sikkim tunnel collapse death toll climbs to 13 at NHPC Teesta Stage-VI project
Synopsis
Key Takeaways
The death toll in the tunnel collapse at the under-construction NHPC Teesta Stage-VI Hydropower Project in Sikkim's Namchi district rose to 13 on Wednesday, 22 July, after rescue teams recovered one more body from the Samardung tunnel in Jholungey, officials confirmed. The tragedy has emerged as one of the deadliest industrial disasters in the state in recent years.
Latest Recovery and Victim Identification
The body was retrieved during the ongoing search operation at the Samardung tunnel, where multiple workers remained trapped following the initial incident. Authorities said all recovered bodies have been transferred to hospitals for identification and post-mortem examinations.
Four bodies were brought to Sir Thutob Namgyal Memorial (STNM) Hospital in Gangtok, while the remaining have been sent to Namchi District Hospital and Singtam District Hospital. So far, only one victim has been formally identified — 31-year-old Shyam Oraon, a resident of Indong Tea Estate in West Bengal's Jalpaiguri district.
Additional Medical Superintendent of STNM Hospital, Suresh Madan Rasaily, said preliminary post-mortem findings indicated that Oraon died due to asphyxia, with additional injuries including burn injuries also noted on the body.
Rescue Operations Suspended Due to Unsafe Conditions
Search and rescue efforts were temporarily suspended after a large accumulation of mud and water inside the tunnel created hazardous conditions for rescue personnel, severely hampering access to the remaining trapped workers. Officials stated that operations would resume at full intensity once conditions inside stabilise and re-entry is deemed safe.
Personnel from the National Disaster Response Force (NDRF), the specialised Asansol Rescue Team, and other emergency response agencies remain stationed at the site, prepared to restart operations at the earliest opportunity.
Challenges Facing Rescue Teams
Officials described the rescue mission as proceeding under extremely challenging conditions, citing unstable ground, water ingress, and heavy mud deposits within the tunnel. Strict safety protocols for rescue personnel are being maintained throughout. This comes amid broader concerns over worker safety at large hydropower infrastructure projects in ecologically sensitive Himalayan terrain.
About the Project and Its Context
The Samardung tunnel is part of NHPC's Teesta Stage-VI Hydropower Project, a major infrastructure undertaking in Sikkim. Rescue agencies have been working round-the-clock since the incident. Notably, Sikkim's Teesta river basin has been the site of repeated infrastructure and natural disaster events in recent years, raising questions about risk assessment protocols at large-scale construction sites in the region.
Authorities continue to make sustained efforts to locate and recover all remaining trapped persons, and further updates are expected as conditions inside the tunnel improve.