Indian Railways steps up fog safety push ahead of winter

Share:
Audio Loading voice…
Indian Railways steps up fog safety push ahead of winter

Synopsis

As winter fog sets in, Indian Railways has ordered a nationwide readiness drive. The plan covers fog safety devices for loco pilots, intensified track patrols, night footplate inspections and spare scratch rakes to absorb delays. GMs and DRMs have been made accountable for strict compliance at every level.

Key Takeaways

Indian Railways held a high-level fog-preparedness meeting on 29 November 2026 .
Railway Board Chairman Satish Kumar chaired the video conference on the directions of Railways Minister Ashwini Vaishnaw .
Key measures include track patrolling, fog safety devices for loco pilots, lime markings, sigma boards and luminous strips at level crossings.
Staff are to be trained on fog precautions, equipment-failure instructions and modified automatic signalling procedures.
Officers must conduct night and footplate inspections , and divisions must keep scratch rakes ready to manage delays.
GMs and DRMs are responsible for monitoring implementation and ensuring strict compliance.

Indian Railways on Sunday, 29 November 2026, held a high-level review meeting in New Delhi on safety and operational preparedness for the winter fog season, when low visibility routinely disrupts train services. The video conference was chaired by Railway Board Chairman Satish Kumar on the directions of Railways Minister Ashwini Vaishnaw. It covered track patrolling, fog safety devices for loco pilots, better signal visibility and staff training across all Zonal Railways and Divisions.

Board Members, General Managers (GMs) of Zonal Railways, Divisional Railway Managers (DRMs) and other field officers took part in the discussions, according to an official statement.

Key Safety Measures Discussed

A central focus was regular and effective track patrolling through the fog season. Patrolmen are to carry all essential safety equipment while on duty.

The meeting also stressed the deployment of fog safety devices. These are meant to help locomotive pilots run trains safely when visibility drops sharply.

To improve visibility on the ground, officials emphasised lime markings and sigma boards at signals, and luminous strips at level crossing gates. They also called for clearly visible tail lamps and 'X' marks on the last vehicle of every train.

Focus on Staff Training and Vigilance

The review highlighted the need for adequate training for railway staff in three areas:

  • fog-related safety precautions
  • working instructions to follow when equipment fails
  • modified automatic signalling procedures

Officials were asked to strengthen alertness and vigilance among all personnel handling train operations and safety duties. The meeting also called for close monitoring of fire and smoke detection systems, including those installed in pantry cars.

Night Inspections and Scratch Rakes

Officers were told to carry out regular night inspections, including footplate inspections, to check preparedness on the ground and counsel staff on safety practices.

The meeting also stressed keeping enough scratch rakes available. These spare train sets give operators flexibility and help manage delays during fog-related disruptions.

Accountability at Zonal and Divisional Levels

The GMs of Zonal Railways and the DRMs have been directed to regularly monitor implementation of these measures. They must also ensure strict compliance at every level.

According to the statement, Indian Railways is taking comprehensive steps to keep train operations safe, reliable and efficient through the fog season. It said the emphasis is on staff preparedness, better visibility and strict adherence to prescribed safety protocols.

The exercise comes as dense fog begins to settle over large parts of the country. Fog has historically caused widespread delays and rescheduling of train services, particularly on northern routes.

What Comes Next

The measures now move to zonal and divisional managements for execution. Field-level compliance and night inspections will be key to ensuring safety. Passengers will be watching how far these steps limit the delays that usually follow the onset of winter fog.

Point of View

And the checklist of lime markings, sigma boards and patrols has changed little over the years. The real measure is whether fog safety devices are actually fitted and working on every locomotive running through fog-prone corridors. The order to keep scratch rakes ready is a quiet admission that delays are expected, not prevented. The statement offers no device-coverage figures or punctuality targets, so passengers have no way to hold the system to account once the cancellations begin.
NationPress
29 Nov 2026

Frequently Asked Questions

What did Indian Railways decide at its fog safety meeting?
Indian Railways reviewed preparedness for the winter fog season on 29 November 2026. It directed zones to ensure track patrolling, deploy fog safety devices for loco pilots, improve signal and level-crossing visibility, and train staff on fog-related precautions.
Who chaired the Indian Railways fog preparedness meeting?
Railway Board Chairman Satish Kumar chaired the meeting through video conference, on the directions of Railways Minister Ashwini Vaishnaw. Board Members, GMs, DRMs and field officers participated.
What are fog safety devices in trains?
Fog safety devices are equipment deployed to help locomotive pilots navigate trains safely when fog sharply reduces visibility. Their deployment was one of the key focus areas of the review.
What are scratch rakes and why are they needed during fog?
Scratch rakes are spare train sets kept ready to give operational flexibility. Railways has asked divisions to keep enough of them available to manage train delays caused by fog-related disruptions.
Who is responsible for implementing the fog safety measures?
General Managers of Zonal Railways and Divisional Railway Managers have been directed to regularly monitor implementation. They must also ensure strict compliance with the measures at all levels.
Nation Press
The Trail

Connected Dots

Tracing the thread behind this story — newest first.

8 Dots
  1. Latest 2 months ago
  2. 3 months ago
  3. 4 months ago
  4. 11 months ago
  5. 11 months ago
  6. 1 year ago
  7. 1 year ago
  8. 1 year ago
Google Prefer NP
On Google