Jal Shakti Minister Paatil starts ₹10.05-cr Bhatar road
Synopsis
Key Takeaways
Union Jal Shakti Minister C. R. Paatil on Saturday, 28 November 2026, performed the khatmuhurat for a 24-metre-wide Town Planning road in Surat's Bhatar neighbourhood, starting work to recast the stretch from Ram Chowk to Geetha Restaurant as a cement concrete carriageway. The upgrade, estimated at ₹10.05 crore, began at Swami Vivekananda Garden for a corridor that local residents and daily motorists already treat as a lifeline.
In a post on X, Paatil said the work would make commuting smoother for neighbourhood residents and for vehicle drivers who pass along the road every day. He called it an important step towards strengthening road facilities, keeping in view the needs of Surat's expanding areas. The Gujarati line that carried the promise was blunt: અવરજવર વધુ સુગમ બનાવશે (will make movement more convenient).
Ram Chowk to Geetha Restaurant, 24 metres wide
The alignment is a designated T.P. road — a planned Town Planning corridor of 24 metres — now slated for conversion to cement concrete. Paatil placed the ceremony at Swami Vivekananda Garden rather than a closed work site, tying the start of construction to a public space in Bhatar.
The only cost he put on record is ₹10.05 crore. No completion date was announced. In a city whose textile and diamond economy has pulled neighbourhoods outward, that width on a TP map is meant to become an all-weather, driveable surface — not just a line on a scheme drawing.
TP roads as Surat's neighbourhoods keep growing
Surat has been converting Town Planning scheme roads to concrete as the urban footprint spreads. Such stretches are typically executed by municipal bodies, ward by ward, as traffic loads catch up with planned widths. Paatil, a senior BJP leader and former Gujarat BJP state president, used the Bhatar khatmuhurat to underline that expanding areas need stronger road infrastructure, not merely more of it.
The next test is practical. How fast does the Ram Chowk–Geetha Restaurant stretch leave the garden ceremony and become a finished cement concrete road — and which other Surat wards get similar TP upgrades next. Bhatar now has a 24-metre corridor, a ₹10.05-crore tag, and a city still building the roads its growth already demands.