Kishan Reddy: Secunderabad Station 71% Done, ₹714 Cr Revamp Racing Ahead

Share:
Audio Loading voice…
Kishan Reddy: Secunderabad Station 71% Done, ₹714 Cr Revamp Racing Ahead

Synopsis

Union Minister G. Kishan Reddy on 7 November 2026 confirmed that the ₹714.73 crore redevelopment of Secunderabad Railway Station — serving 1.5 lakh daily passengers — is 71% complete, with a metro skywalk, two-level air concourse, and new station buildings nearing delivery.

Key Takeaways

The Secunderabad Railway Station redevelopment project is valued at ₹714.73 crore and is 71% complete as of November 2026.
The station handles approximately 180 trains and 1.5 lakh passengers every day, making it one of India's busiest rail hubs.
Key upcoming features include a two-level air concourse , multi-level parking , travellator-equipped foot over bridges , and a skywalk linking directly to Hyderabad Metro Rail .
Completed components already include the RPF building , Kazipet-side FOB , south station ground floor, south basement, and South Electrical Sub-Station .
The project is part of the Amrit Bharat Station Scheme , launched in February 2023 , targeting redevelopment of over 1,275 stations nationwide.
Kishan Reddy (BJP Telangana president) shared the update, signalling political ownership of the milestone ahead of its final delivery.

At 71 percent complete and burning through ₹714.73 crore in public investment, the redevelopment of Secunderabad Railway Station — one of India's most congested rail hubs — is on a fast track to a world-class makeover, Union Coal and Mines Minister G. Kishan Reddy announced on Saturday, 7 November 2026.

The post, shared in Telugu, laid out the ambition plainly: a station that handles roughly 180 trains and 1.5 lakh passengers every single day deserves infrastructure that matches that scale. The redevelopment, Reddy wrote, is proceeding శరవేగంగా — 'at arrow speed' — with full-scale passenger availability expected soon.

What's Rising at Secunderabad: The Full Feature List

The upgrade is not a cosmetic refresh. The plans include new station buildings on both the north and south sides, a two-level air concourse, and a multi-level parking facility on the northern end. Travellator-equipped foot over bridges (FOBs) will ease platform-to-platform movement, while a dedicated skywalk will plug the station directly into the Hyderabad Metro Rail network — a multimodal integration that commuters have long demanded.

Improved facilities and new platform flooring round out the passenger-experience upgrades. Taken together, the package moves Secunderabad from functional-but-fraying to genuinely world-class.

What's Already Done: Completed Structures Ahead of Schedule

Several components are already finished and operational. The Railway Protection Force (RPF) building is complete, as is the foot over bridge on the Kazipet side. On the southern end, the ground floor of the south station building — including circulation areas — is ready, along with the south basement and the South Electrical Sub-Station (ESS). These completed pieces signal that the broader project is not slipping; it's sequencing.

Amrit Bharat Scheme: The National Canvas Behind This Project

Secunderabad's transformation sits inside a much larger national frame. The Amrit Bharat Station Scheme, launched in February 2023, targets the redevelopment of over 1,275 railway stations across India with modern amenities and multimodal connectivity. High-traffic urban nodes — New Delhi, Mumbai Central, and now Secunderabad — are the visible flagships of that programme, each intended to demonstrate what a reimagined Indian station can feel like.

For Hyderabad, Secunderabad is not merely one station among many. It is the city's oldest and busiest rail terminal, a nerve centre for both commuters and long-distance travellers. A seamless metro-to-rail skywalk here could meaningfully shift how hundreds of thousands of people move through the agglomeration every week.

The next milestone to watch: a formal inauguration announcement from the Ministry of Railways once the remaining 29 percent of work is wrapped up — and whether the skywalk metro link opens in tandem with the broader station reveal.

Point of View

The BJP's Telangana state president is building an infrastructure narrative heading into what remains a competitive political landscape in the state. The metro-skywalk integration is the headline detail — it represents the kind of multimodal urban mobility upgrade that appeals directly to Hyderabad's large middle-class commuter base. More broadly, the Amrit Bharat Station Scheme has become a durable vehicle for the Centre to project urban infrastructure delivery in state capitals, and Secunderabad — as a highly visible, high-footfall symbol — is a natural showcase. The question of whether the formal inauguration aligns with an electoral or political calendar is worth watching.
NationPress
7 Nov 2026

Frequently Asked Questions

What is the total cost of Secunderabad Railway Station redevelopment?
The total project cost for the redevelopment of Secunderabad Railway Station is ₹714.73 crore , under the Amrit Bharat Station Scheme.
How much of Secunderabad station redevelopment is complete?
As of November 2026 , 71 percent of the redevelopment work at Secunderabad Railway Station has been completed, according to Union Minister G. Kishan Reddy.
What new facilities will Secunderabad station get?
The upgraded Secunderabad station will feature a two-level air concourse , new station buildings on both sides, a multi-level parking facility , travellator-equipped foot over bridges, a metro skywalk , and improved platform flooring.
Will Secunderabad station be connected to Hyderabad Metro?
Yes. A dedicated skywalk is planned to provide direct connectivity between Secunderabad Railway Station and the Hyderabad Metro Rail network as part of the ongoing redevelopment.
What is the Amrit Bharat Station Scheme?
The Amrit Bharat Station Scheme was launched in February 2023 to redevelop over 1,275 railway stations across India with world-class amenities, multimodal integration, and improved passenger infrastructure.
Nation Press
The Trail

Connected Dots

Tracing the thread behind this story — newest first.

8 Dots
  1. Latest 12 min ago
  2. 5 days ago
  3. 5 days ago
  4. 3 months ago
  5. 3 months ago
  6. 4 months ago
  7. 5 months ago
  8. 5 months ago
Google Prefer NP
On Google