TN farmers to meet President Murmu on Sept 4, seek ₹1 lakh crore Cauvery compensation
Synopsis
Key Takeaways
The National South Indian Rivers Interlinking Farmers Association has sought an appointment with President Droupadi Murmu on 4 September 2025 to present a memorandum demanding ₹1 lakh crore in compensation from the Karnataka government, alleging that the state has repeatedly failed to release its share of Cauvery river water to Tamil Nadu, leaving thousands of farmers exposed to drought. The association's State President, P Ayyakannu, made the announcement in Chennai on Tuesday, 18 August.
What the Farmers' Body Is Demanding
Ayyakannu stated that the delegation will travel to New Delhi on 4 September to submit a formal memorandum to the President. 'According to the Constitution and the Supreme Court's instructions, Tamil Nadu releases Cauvery river water every month to Karnataka but the latter refuses to do so. As a result, all big, small and marginal farmers are affected by drought,' he said. He added that the compensation must be paid to farmers in Tamil Nadu 'to prevent them from committing suicides.' The association has already written to the President's office seeking permission for the meeting, according to Ayyakannu.
Reservoir Crisis: Storage at 37% of Capacity
The demand comes against the backdrop of a deepening water crisis in Tamil Nadu. As of Monday, 17 August, the 90 reservoirs monitored by the state's Water Resources Department collectively held 83.124 thousand million cubic feet (tmcft) — just 37.05% of their combined capacity of 224.343 tmcft. This is less than half the storage recorded during the same period last year, when the reservoirs held 189.545 tmcft, underscoring the severity of the current shortfall.
Mettur and District-Level Breakdown
Mettur Dam, Tamil Nadu's most critical reservoir for Cauvery delta irrigation, held 43.275 tmcft — representing 46.30% of its total capacity of 93.470 tmcft. Of the 90 reservoirs statewide, 58 have less than 25% storage, 14 are between 26% and 50%, 15 are between 51% and 76%, and only two have crossed the 80% mark. The sole reservoir at full capacity is the Gundar in Tenkasi district, with a storage of 18.43 million cubic feet.
Why This Matters
An underperforming southwest monsoon and unusually high temperatures have compounded the strain on Tamil Nadu's water resources this season. The combination of low reservoir levels and the alleged shortfall in Cauvery releases from Karnataka has raised urgent concerns over both irrigation and drinking-water availability across several districts. This is not the first time the Cauvery dispute has escalated to a demand for presidential intervention — the river-sharing conflict between the two states has a decades-long legal and political history, with the Supreme Court having issued binding allocation orders that both states have periodically contested. With the kharif season under stress and no immediate resolution in sight, the pressure on farmers in the Cauvery delta is expected to intensify in the weeks ahead.