Arunachal forms high-level panel for ₹1.5 lakh crore Upper Siang power project survey
Synopsis
Key Takeaways
The Arunachal Pradesh government on Wednesday, 23 September 2026, decided to constitute an empowered high-level committee to guide and coordinate the Pre-Feasibility Report (PFR) survey for the proposed Upper Siang Multipurpose Project (SUMP) in Siang and Upper Siang districts. The move follows a Cabinet resolution passed under the leadership of Chief Minister Pema Khandu, signalling renewed momentum behind one of India's most consequential hydropower undertakings.
About the Upper Siang Multipurpose Project
The SUMP is a mega hydropower initiative with a proposed generation capacity of 11,000 MW and an estimated outlay of ₹1.5 lakh crore. The Union government declared it a National Project in 2008, underlining its strategic importance for both Arunachal Pradesh and the country at large. The project takes its name from the Siang river — the local Arunachal name for the upper stretch of the Brahmaputra — one of Asia's most powerful river systems.
Cabinet Resolution and Committee Structure
A senior official from the Chief Minister's Office (CMO) confirmed that the state Cabinet passed the resolution to constitute the empowered committee. The panel will be chaired by Ojing Tasing, Minister for Rural Development and Panchayati Raj. Its members include Alo Libang, Advisor to the Chief Minister and MLA for Yingkiong and Tuting, along with MLAs Oni Panyang and Geku-Mariyang. The committee's mandate is to ensure the PFR survey is conducted in a transparent, peaceful, and people-centric manner, according to the CMO official.
Addressing Community Concerns
The Cabinet also took note of concerns raised by sections of local residents in the two districts, attributing unrest partly to what it described as misinformation and disinformation spread by vested interests. Officials affirmed that the welfare, voices, and aspirations of likely Project Affected Families (PAFs) and local communities will remain central to the process. The Cabinet reaffirmed its commitment to development that respects local traditions and community interests, expressing confidence that sustained dialogue will allow the survey to proceed peacefully.
Strategic and National Significance
Beyond electricity generation, the SUMP is expected to strengthen water and energy security, aid flood moderation in the Siang-Brahmaputra basin, generate employment, and support the long-term socio-economic development of the Siang region. This comes amid growing national focus on northeastern hydropower as a counterweight to China's upstream dam-building on the Brahmaputra — a geopolitical dimension that has lent additional urgency to the project's progress. Notably, this Cabinet action marks a concrete administrative step after years of planning and community consultation.
What Happens Next
The newly constituted high-level committee is expected to begin coordinating PFR survey activities across Siang and Upper Siang districts in the coming weeks. Meaningful engagement with local communities will be a prerequisite for the survey's peaceful conduct, the Cabinet resolution emphasised. Progress on the PFR will determine timelines for detailed project reports and eventual construction clearances.