Minister Joshi: Cabinet clears ₹4,288-cr Kamarajar terminal
Synopsis
Key Takeaways
India just added another piece to the puzzle of cheaper, faster cargo on the east coast. On 25 November 2026, Union Consumer Affairs Minister Pralhad Joshi said the Union Cabinet, under Prime Minister Narendra Modi, had approved a second container terminal at Kamarajar Port Limited in Ennore, Tamil Nadu, with an estimated investment of ₹4,288.26 crore.
Joshi framed the decision as strengthening India's maritime infrastructure and expanding its container-handling capacity. The facility, he said, will be a 900-metre-long terminal developed in two phases, with an annual handling capacity of 2 million TEUs.
900 metres, two phases, 2 million TEUs
That is not a modest add-on. Two million twenty-foot equivalent units a year is the kind of box volume that changes how shipping lines schedule calls and how exporters in southern India price a shipment to Europe or Southeast Asia.
He put the scale on the record: “The 900-metre-long terminal, to be developed in two phases, will have an annual handling capacity of 2 million TEUs, further strengthening India's maritime trade infrastructure.”
Ennore's bet beyond Chennai's older docks
Kamarajar Port, once known as Ennore Port, sits north of Chennai and has grown as a specialised major port for coal, containers and bulk cargo. Expanding it is meant to complement — and relieve — older facilities at Chennai as container traffic climbs.
The pattern is familiar. India has kept adding capacity at major ports to bring down logistics costs. Corporatised ports such as Kamarajar have been the preferred vehicles for that expansion, giving operators clearer commercial room than the older trust model.
From Sagarmala to Gati Shakti
The project sits on a decade-long policy spine. Sagarmala, launched in 2015, was built around port-led development and coastline modernisation. Maritime India Vision 2030, released in 2021, set sharper targets for capacity and turnaround.
Shipping lines, exporters and importers are the first to feel whether a new berth is real capacity or just a line in a cabinet note. The test after this approval is phased tendering, construction timelines for the two phases, and whether the terminal is wired into PM Gati Shakti multimodal plans — rail, road and coastal shipping moving as one, not as three disconnected files.
A 900-metre quay at Ennore will not, by itself, cut India's logistics bill. It becomes consequential the day the hinterland can actually feed it. That is the next cabinet-sized question this project now poses.