Dr Jitendra Singh hails Cabinet nod for Kamarajar Port terminal
Synopsis
Key Takeaways
Union Science and Technology Minister Dr. Jitendra Singh on Wednesday announced a Cabinet approval for a second container terminal at Kamarajar Port Limited in Ennore, Tamil Nadu, under the PPP mode on a DBFOT basis. He called it a significant boost to India’s maritime infrastructure and a step toward making India a global maritime hub.
Kamarajar Port’s second container terminal
The Union Cabinet, chaired by Prime Minister Narendra Modi, cleared the Second Container Terminal at the major port on 25 November 2026. Kamarajar Port Limited, once known as Ennore Port, already handles coal, iron ore and containers on the east coast. A second terminal is meant to add berth space and lift cargo-handling efficiency as trade grows.
In his post, Dr. Jitendra Singh said the project will ‘strengthen port capacity, enhance cargo-handling efficiency, promote trade and logistics connectivity, and further advance India’s vision of becoming a global maritime hub.’
PPP on a DBFOT basis at Ennore
The chosen route is public-private partnership on a design-build-finance-operate-transfer, or DBFOT, basis. The private partner designs, builds, finances and operates the terminal before transferring it. Several container terminals at major ports have used that model since 2014.
For port operators, shipping lines and exporters, the next markers are the tender and financial closure. Those steps will decide how quickly extra boxes start moving through Ennore.
Sagarmala and the east-coast cargo shift
The nod sits inside a longer policy arc. The Sagarmala programme, launched in 2015, was built to modernise ports and stitch coastal economic zones into a logistics network. Successive governments have used PPPs to expand capacity, cut logistics costs and lift India’s share of global trade.
Container terminals are the hinge of that shift — from bulk commodities toward value-added cargo. Cabinet approvals for capacity at both major and non-major ports have become a recurring pattern. This one keeps Ennore in that queue.
Tendering for the second terminal, and any follow-on Cabinet decisions on other port PPPs, will show how fast the east coast can convert paper approvals into berths.
Ennore now has a Cabinet-stamped second terminal. The clock on the first extra box starts with the tender.