CM Dhami Clears ₹17.75 Cr for Roads, Temples, Water Across Uttarakhand
Synopsis
Key Takeaways
Seventeen crore rupees and seventy-five lakh of them — spread across six districts, routed to mountain villages that need a road, a handpump, or a temple complex worthy of the pilgrims who already walk to it. Chief Minister Pushkar Singh Dhami on Wednesday, 18 November 2026, approved this multi-district package of infrastructure spending under the CM Announcements scheme, covering assembly segments from Dharchula in Pithoragarh to Bhagwanpur in Haridwar.
Temple upgrades from Tehri Garhwal to Champawat
The religious-infrastructure slice of the package is the most detailed. In Pratapnagar constituency, Tehri Garhwal, ₹98.77 lakh has been approved for a dharamshala (rest house), rooms and toilets near Huneshwar Mahadev Temple, with a first instalment of ₹59.26 lakh released immediately. Next door, in Devprayag constituency, ₹36.19 lakh goes to the beautification of Binsar Devata Temple and interlocking tile work at Gram Sabha Badola, Urmaan Tok in Kirti Nagar block, and a further ₹39.94 lakh for the upgrade of Dagar Shivalaya.
In Champawat district's Lohaghat segment, the historic Doodhadhari Bhagwati Mela ground at Gram Panchayat Thanta gets ₹97.10 lakh — covering a spectator gallery, meditation centre and overall beautification — with ₹58.26 lakh released in the first tranche. These are not just aesthetic investments: Uttarakhand's pilgrimage and rural-tourism economy depends on the kind of visitor infrastructure that is still missing at dozens of lesser-known sacred sites.
Pithoragarh's mela ground and the Madkot horse trail
In Dharchula constituency, Pithoragarh, ₹79.49 lakh is sanctioned for the Gatghorgadi Nauling Mela ground, with ₹47.69 lakh as the first instalment. Separately, ₹29.84 lakh will fund a pedestrian and equestrian track from Mandakini Bridge to Gram Sabha Rapti in the Madkot area — the kind of path that is a genuine lifeline in terrain where motorable roads run out quickly. In Didihat constituency, Gram Panchayat Kholimali Kanyuri receives ₹93.64 lakh for cobbled roads, a cemented track, a culvert and protective works, with ₹56.18 lakh disbursed upfront.
Champawat's rural road push: Tanakpur and Banabasa get 20 km of internal lanes
The largest single-line figure in the announcement is a combined ₹614 lakh for 10 km each of internal rural roads in Tanakpur and Banabasa — terai towns near the Nepal border whose peripheral villages have long lobbied for all-weather connectivity. Of that, ₹5 crore is cleared for spending in the current financial year. A smaller but symbolically significant ₹81.96 lakh project — the Basudhuara-Sela link road in Champawat constituency — receives an initial ₹25 lakh to begin work.
250 handpumps for Haridwar's rural belt
The drinking-water component targets Haridwar district. ₹99.44 lakh is approved for 50 handpumps in rural areas of Jhabrera constituency, with ₹59.66 lakh released first. Bhagwanpur constituency gets a larger allocation of ₹100.43 lakh for 200 handpumps — an indication of how acute groundwater access remains in the district's farming villages even as Haridwar is better known as a pilgrimage hub.
Gadarpur and Lohaghat: bloc allocations under CM announcements
Two constituency-level bloc approvals round out the package. Gadarpur in Udham Singh Nagar receives a combined ₹184.37 lakh for works proposed under CM announcements, while Lohaghat in Champawat gets an additional ₹220 lakh under the same framework — underlining that the scheme functions both as a project-by-project sanction mechanism and as a lump-sum constituency development tool.
The CM Announcements scheme has been a fixture of Uttarakhand governance since at least the early 2010s, designed to push targeted development funds into hilly and remote assembly segments where normal departmental allocations move slowly. With first-instalment releases accompanying most of Wednesday's approvals, the state government is signalling an intent to show ground-level movement before the financial year closes.