CM Naidu Inaugurates Seed Access E-3 Road in Amaravati
Synopsis
Key Takeaways
A new artery opened in Amaravati on Thursday, August 13, 2026 — and it signals more than just smoother commutes. Chief Minister Nara Chandrababu Naidu inaugurated the critical Seed Access E-3 Road and a set of steel bridges in the designated capital city, marking another concrete step in the long-delayed mission to build Andhra Pradesh's new seat of power from the ground up.
What the E-3 Road Unlocks for Amaravati's Spine
The Seed Access E-3 Road is not a peripheral link — it is part of the capital city's master-plan arterial network, designed to connect core zones within Amaravati's planned layout. Steel bridges inaugurated alongside it extend the corridor's reach across low-lying terrain, a practical necessity given the Krishna riverine geography of the region. CM Naidu addressed the gathering after the ribbon-cutting, with the event drawing Amaravati farmers and local residents in large numbers — a detail that underscores how personally the communities who gave their land to this project track its progress.
Ministers, MPs, and MLAs Who Stood on the Dais
The inauguration was flanked by senior political figures: Minister P. Narayana, Minister Nadendla Manohar, MP Bhashyam Ramakrishna, and MLAs Tenali Sravana Kumar and Kolikipudi Srinivasarao were among those present. The turnout of both elected representatives and local citizens gave the event the character of a public milestone rather than a routine administrative function.
Amaravati's Stop-Start Journey Since 2014
The capital project has a turbulent backstory. After Andhra Pradesh's bifurcation in 2014 left the state without Hyderabad, Amaravati was chosen as the new capital through a land-pooling model — farmers contributed agricultural land in exchange for developed plots. The foundation stone was laid and early works began, but the project stalled after a change in state government in 2019, with the successor administration proposing three capitals and eventually pausing Amaravati construction entirely. Naidu's return to power reopened the file, and today's inauguration is part of the resumption of that original vision. For the farmers who pooled their land years ago and watched construction freeze, every new road is a proof point that the bargain they made will be honoured.
The road and bridges now join a growing list of Amaravati infrastructure completions under the current administration. Subsequent phases of the capital's road network remain on the agenda — and the pace at which they arrive will define whether Amaravati transitions from aspiration to functioning city within this political term.