Eastern Railway to install 131 chlorination plants for safe drinking water
Synopsis
Key Takeaways
Eastern Railway (ER) has announced plans to set up 131 new chlorination plants across its station network to improve drinking-water quality for passengers, as part of a broader, railway-wide hygiene drive. The initiative, which also encompasses comprehensive water tank cleaning and clinical water-sample testing, signals a structural shift from reactive maintenance to systematic water-quality management.
Scale of the Cleaning Drive
Between 20 August and 23 September 2026, Eastern Railway cleaned a total of 6,955 water tanks — covering overhead tanks, underground reservoirs, and PVC tanks — across all divisions and workshops. The breakdown by division reveals the scale of the exercise: Asansol Division cleaned 2,449 tanks, Howrah Division attended to 2,123, Sealdah Division cleaned 1,464, and Malda cleared 919 tanks.
'All tanks underwent thorough cleaning and proper water treatment to ensure source reservoirs remain free from contamination for the supply of clean water,' an official said.
131 New Chlorination Plants Underway
Work on the 131 chlorination plants is already underway, according to officials. A special initiative has simultaneously been launched to clinically test water samples collected from taps at various stations, monitoring quality at the point of consumption rather than relying solely on end-of-pipe testing — a methodological upgrade that railway planners say will better reflect the actual water passengers drink.
What the Action Plan Covers
The Railway Board has directed zonal railways to undertake comprehensive inspections covering water sources, treatment and filtration plants, underground and overhead tanks, PVC tanks, water booths, taps, and water dispensing points. 'All drinking-water tanks will be drained, desludged, scrubbed and disinfected. Measures will also be taken to ensure tight covers and appropriate protection of vents and overflow points from birds, animals and algae,' the Railway Board stated.
Damaged tanks, pipelines, and filters are to be repaired or replaced as required. Critically, officials have been instructed to eliminate any cross-connection between potable and non-potable water systems, and all piping in the drinking-water circuit is being checked for leakages to prevent water wastage.
Hand Pumps and Borewells Under the Scanner
Special attention is being paid to stations that rely on hand pumps and borewells for drinking water. Zonal railways have been specifically directed to ensure these sources remain free from contamination — a historically neglected segment of railway water infrastructure.
Accountability and Monitoring Mechanism
Each zonal railway is required to submit station-wise details of deficiencies identified and corrective actions taken. This reporting mechanism, officials say, will enable systematic, time-bound resolution of gaps identified during the special drive — moving the exercise beyond a one-off campaign into a continuous compliance framework. How effectively these commitments translate into measurable improvements at the platform level will be watched closely in the months ahead.