Odisha coastal highway: CCEA clears ₹8,300 crore Rameshwar-Paradeep project
Synopsis
Key Takeaways
The Cabinet Committee on Economic Affairs (CCEA), chaired by Prime Minister Narendra Modi, on 3 June 2025 approved the construction of a new ₹8,300.79 crore Coastal Highway from Rameshwar to Paradeep in Odisha, spanning 160.18 km across four coastal districts. Odisha Chief Minister Mohan Charan Majhi welcomed the clearance, calling it the start of a new chapter in the state's infrastructure push.
What the CCEA cleared
The project will be executed on the Hybrid Annuity Model (HAM) in two packages. Package-1 from Rameshwar to Konark will be a four-lane corridor, while Package-2 from Konark to Paradeep will be a two-lane stretch with paved shoulders, both designed for a speed of 100 km/hour.
The alignment passes through Khurda, Puri, Kendrapada, and Jagatsinghpur districts, connecting nine economic nodes and five logistics nodes under the PM GatiShakti framework.
What CM Majhi said
In a post on X, Majhi said the landmark project will strengthen connectivity, cut travel time by nearly 2.5 hours, and unlock fresh opportunities in tourism, trade, and logistics. He added that the highway 'will accelerate the transformation of Odisha's coastal economy' and improve the quality of life for millions.
The Chief Minister thanked PM Modi and Union Road Transport Minister Nitin Gadkari on behalf of the people of Odisha, framing the approval as a reaffirmation of the Centre's commitment to the state's development.
Why a new corridor was needed
The existing NH-16, part of the Golden Quadrilateral, is a six-lane road through Khordha, Bhubaneswar, and Cuttack, while NH-316 links Bhubaneswar with Puri, Satapada, and Konark. However, the Puri-Satapada and Puri-Konark stretches suffer from poor road geometry, with nearly 40 per cent ribbon development along the corridor and heavy local commuter traffic — making long-distance movement inefficient, according to the official statement.
Economic impact
The Centre expects the project to lift India's Logistics Performance Index (LPI) ranking once operational. For Odisha, the highway connects the industrial hinterland to Paradeep Port — one of India's largest major ports by cargo volume — potentially shortening turnaround for bulk and container traffic.
What's next
Tendering and land acquisition timelines for the HAM packages are expected to follow in the coming months. On completion, travel time between Rameshwar and Paradeep is projected to drop by about 2.5 hours, reshaping commerce along Odisha's coastline.