Kishan Reddy: Secunderabad Station 71% Done, ₹714 Cr Revamp Racing Ahead
Synopsis
Key Takeaways
At 71 percent complete and burning through ₹714.73 crore in public investment, the redevelopment of Secunderabad Railway Station — one of India's most congested rail hubs — is on a fast track to a world-class makeover, Union Coal and Mines Minister G. Kishan Reddy announced on Saturday, 7 November 2026.
The post, shared in Telugu, laid out the ambition plainly: a station that handles roughly 180 trains and 1.5 lakh passengers every single day deserves infrastructure that matches that scale. The redevelopment, Reddy wrote, is proceeding శరవేగంగా — 'at arrow speed' — with full-scale passenger availability expected soon.
What's Rising at Secunderabad: The Full Feature List
The upgrade is not a cosmetic refresh. The plans include new station buildings on both the north and south sides, a two-level air concourse, and a multi-level parking facility on the northern end. Travellator-equipped foot over bridges (FOBs) will ease platform-to-platform movement, while a dedicated skywalk will plug the station directly into the Hyderabad Metro Rail network — a multimodal integration that commuters have long demanded.
Improved facilities and new platform flooring round out the passenger-experience upgrades. Taken together, the package moves Secunderabad from functional-but-fraying to genuinely world-class.
What's Already Done: Completed Structures Ahead of Schedule
Several components are already finished and operational. The Railway Protection Force (RPF) building is complete, as is the foot over bridge on the Kazipet side. On the southern end, the ground floor of the south station building — including circulation areas — is ready, along with the south basement and the South Electrical Sub-Station (ESS). These completed pieces signal that the broader project is not slipping; it's sequencing.
Amrit Bharat Scheme: The National Canvas Behind This Project
Secunderabad's transformation sits inside a much larger national frame. The Amrit Bharat Station Scheme, launched in February 2023, targets the redevelopment of over 1,275 railway stations across India with modern amenities and multimodal connectivity. High-traffic urban nodes — New Delhi, Mumbai Central, and now Secunderabad — are the visible flagships of that programme, each intended to demonstrate what a reimagined Indian station can feel like.
For Hyderabad, Secunderabad is not merely one station among many. It is the city's oldest and busiest rail terminal, a nerve centre for both commuters and long-distance travellers. A seamless metro-to-rail skywalk here could meaningfully shift how hundreds of thousands of people move through the agglomeration every week.
The next milestone to watch: a formal inauguration announcement from the Ministry of Railways once the remaining 29 percent of work is wrapped up — and whether the skywalk metro link opens in tandem with the broader station reveal.