Scindia inspects Gwalior multilevel parking project, orders waterlogging fix
Synopsis
Key Takeaways
Union Minister Jyotiraditya Scindia on Monday, 21 September 2026, inspected the under-construction multilevel car parking facility at Maharaj Bada in Gwalior and directed officials to commission a technical study to find a permanent solution to water accumulation in the project's third basement. The ₹77 crore Smart City scheme project is designed to ease chronic parking congestion in one of the city's busiest commercial zones.
What Scindia Reviewed on Site
During the walkthrough, Scindia took stock of construction progress, build quality, and drainage arrangements. He focused specifically on the waterlogging problem in Basement-3 and directed that the outlet and drainage system be redesigned to offer a safe and lasting remedy. He also asked officials of the district administration and the Gwalior Municipal Corporation (GMC) to monitor the situation continuously and prevent similar deficiencies from recurring.
What the Minister Said
'Every single rupee of public money should be utilised for quality work. Development projects need to be completed with speed, but there should be no compromise on quality and construction precautions,' Scindia said during the inspection. He added: 'Water, roads and electricity are basic facilities directly connected with the lives of common people. The funds provided by the Centre and the state government should be properly utilised to create facilities that benefit citizens for a long time.'
Project Details and Timeline
The facility, being developed under the Smart City scheme at an estimated cost of approximately ₹77 crore, will have a total capacity of 429 vehicles — comprising 353 four-wheelers and 76 two-wheelers. Scindia directed that basement and ground-floor work be completed by January–February 2027 and called for regular review meetings to keep the project on schedule. He asked officials to accelerate construction without compromising on prescribed quality standards.
Broader Significance for Gwalior
The Maharaj Bada area has long struggled with parking congestion, and the multilevel facility is seen as a key piece of the city's planned urban infrastructure upgrade. This comes amid a wider push under the Smart Cities Mission to modernise civic amenities in tier-2 cities across India. Notably, waterlogging in basement structures remains a recurring challenge for underground parking projects in central India, where seasonal rainfall can overwhelm drainage systems if not engineered adequately.