Bhakhra Dam completely safe, says Punjab minister in Assembly

Share:
Audio Loading voice…
Bhakhra Dam completely safe, says Punjab minister in Assembly

Synopsis

Punjab's water minister took to the Assembly floor to counter viral reports that Bhakhra Dam had tilted dangerously — clarifying that a 1.03-inch movement recorded in 2025 is the 16th such event since 1995, every one of which reversed without incident. The real concern, quietly buried in the same statement: 26% silt accumulation has already eaten into reservoir capacity, and the Centre has yet to act on desilting.

Key Takeaways

Punjab Water Resources Minister Barinder Kumar Goyal declared Bhakhra Dam completely safe in the state Assembly on 6 August 2025 .
The reported movement of 1.03 inches is within the dam's engineering design parameters and is not a structural anomaly.
Between 1995 and 2025 , similar movement was recorded 15 times ; the structure returned to its normal position each time.
Silt deposits lie 12 km upstream of the dam wall and do not affect structural safety, the minister clarified.
Approximately 26 per cent silt accumulation has reduced reservoir storage capacity, though not dam safety.
Punjab has written to the BBMB and the Union Government urging desilting operations at the earliest.

Punjab Water Resources Minister Barinder Kumar Goyal on Thursday, 6 August 2025, categorically dismissed speculation about the structural integrity of the Bhakhra Dam, telling the state Assembly during Zero Hour that the dam is completely safe and there is absolutely no reason for public panic. The minister said misleading media reports had triggered unnecessary fear among residents of Punjab.

What the Minister Said

Goyal clarified that the reported movement of the dam is an inherent feature of its engineering design, not a sign of structural failure. Referring specifically to media reports claiming the dam had tilted, he said such coverage had created needless alarm. He described Bhakhra Dam as one of the world's finest engineering marvels, noting that expert teams from countries including the United States and Canada have acknowledged its robust design and construction standards.

The 1.03-Inch Movement Explained

The minister explained that the dam is engineered to experience slight movement when water pressure rises and to return to its original position once pressure recedes. The recorded movement of 1.03 inches falls well within the dam's engineering design parameters, he said. Between 1995 and 2025, such movement was recorded 15 times, and on every occasion the structure reverted to its normal position without any safety concern. Goyal confirmed that the movement observed in 2025 is consistent with this pattern of normal structural behaviour.

Silt Accumulation: A Capacity Issue, Not a Safety Risk

Addressing concerns about silt build-up, Goyal clarified that the deposited silt lies nearly 12 km upstream of the dam wall and has no bearing on the dam's structural stability. He acknowledged, however, that approximately 26 per cent silt accumulation has reduced the reservoir's storage capacity. The minister stressed that while this affects water availability, it does not compromise the dam's safety.

Punjab Pushes Centre and BBMB on Desilting

Goyal said the responsibility for desilting operations rests with the Bhakra Beas Management Board (BBMB) and the Union Government. He informed the House that Punjab has consistently raised the issue at BBMB meetings and that the state government has recently written to both the BBMB and the Centre urging them to undertake desilting at the earliest. 'Punjab has consistently raised the issue of desilting during meetings of the Bhakra Beas Management Board,' he said. The minister added that restoring the reservoir's storage capacity through desilting would enhance overall water availability for the state.

What Happens Next

With the Centre and BBMB now formally urged to act, the pace of desilting operations will be closely watched. Experts and opposition members are likely to press for an independent structural audit and a concrete desilting timeline, particularly as reservoir capacity concerns grow alongside seasonal water demand.

Point of View

The government risks appearing reactive to social-media rumour rather than proactively transparent. More importantly, the 26% silt figure is the story that outlasts the news cycle: a reservoir losing more than a quarter of its capacity is a long-term water-security problem for Punjab, and the Centre's slow response on BBMB desilting is an accountability gap that one Assembly statement cannot close. The dam may be safe today; the water it can store is measurably less than it was.
NationPress
6 Aug 2026

Frequently Asked Questions

Is Bhakhra Dam structurally safe in 2025?
Yes, according to Punjab Water Resources Minister Barinder Kumar Goyal, who told the state Assembly on 6 August 2025 that the dam is completely safe. The recently reported movement of 1.03 inches falls within its engineering design parameters and mirrors 15 similar events recorded between 1995 and 2025, each of which reversed without incident.
Why did reports claim Bhakhra Dam had tilted?
Media reports suggested the dam had tilted, triggering public concern. The minister clarified that the dam is designed to experience slight movement under increased water pressure and return to its original position once pressure recedes, characterising the coverage as misleading.
Does silt accumulation threaten Bhakhra Dam's safety?
No, according to the minister. The silt is deposited nearly 12 km upstream of the dam wall and has no connection to its structural stability. However, approximately 26 per cent silt accumulation has reduced the reservoir's storage capacity, which affects water availability.
Who is responsible for desilting Bhakhra Dam's reservoir?
The Bhakra Beas Management Board (BBMB) and the Union Government are responsible for desilting operations, according to Minister Goyal. Punjab has formally written to both bodies urging them to undertake the work at the earliest.
How many times has Bhakhra Dam moved in this way before?
Between 1995 and 2025, similar structural movement was recorded 15 times. On every occasion, the dam reverted to its original position without any safety concern, the minister told the Assembly.
Nation Press
The Trail

Connected Dots

Tracing the thread behind this story — newest first.

8 Dots
  1. Latest 1 month ago
  2. 2 months ago
  3. 11 months ago
  4. 11 months ago
  5. 11 months ago
  6. 1 year ago
  7. 1 year ago
  8. 1 year ago
Google Prefer NP
On Google